Confirmed by BLDUP.Related...it looks like a building permit search was issued for this site on Monday. Looks like a permit to build on Parcel N.
permitnumber worktype permittypedescr description comments applicant declared_valuation total_fees issued_date expiration_date status owner occupancytype sq_feet address city state zip property_id parcel_id lat long ERT1282568 ERECT Erect/New Construction Erect Erect 17-story 400 000 sf Core & Shell tower. Uses: Office Innovation Laboratory & Accessory Laboratory Accessory Light Manufacturing Retail Restaurant and Service above existing 3-level 525-space below grade parking garage (serving as the foundation constructed per ERT992394). PDA#78. LPR. John Gorman 146705645 1476270 04/25/2022 10:21 10/25/2022 0:00 Open SEAPORT N/P TITLE HOLDER LLC Comm 400000 350-368 Summer St Boston MA 2210 443121 602766010
Better than before?The view down Congress is looking QUITE different these days
![]()
I like the new look. The view before always gave off a "whelp that's the end of the city folks" vibe to me.Better than before?
View attachment 23867
I like the new look. The view before always gave off a "whelp that's the end of the city folks" vibe to me.
IMG_6125 by Bos Beeline, on Flickr
IMG_6140 by Bos Beeline, on Flickr
IMG_6169 by Bos Beeline, on Flickr
IMG_6202 by Bos Beeline, on Flickr
IMG_6214 by Bos Beeline, on Flickr
IMG_6221 by Bos Beeline, on Flickr
IMG_6225 by Bos Beeline, on Flickr
IMG_6244 by Bos Beeline, on Flickr
IMG_6336 by Bos Beeline, on Flickr
IMG_6366 by Bos Beeline, on Flickr
IMG_6374 by Bos Beeline, on Flickr
IMG_6385 by Bos Beeline, on Flickr
IMG_6389 by Bos Beeline, on Flickr
IMG_6388 by Bos Beeline, on Flickr
IMG_6391 by Bos Beeline, on Flickr