    Aloft & Element Phase 2 | 391 D Street | SBW

    can a mod change the title to: Aloft & Element Phase 2 | 391 D Street | South Boston Waterfront
  2. G

    Bill Russell Bridge | North Washington St.

    https://charlestownbridge.com/2025/02/20/north-washington-street-bridge-5/ Scheduled Work • West sidewalk concrete placements • Marine fender pile concrete fill • Lovejoy walkway pile cap concrete placements • FRP fascia screening installation
  3. G

    Bill Russell Bridge | North Washington St.

    https://beaconhilltimes.com/2025/01/09/north-washington-street-bridge-4/ • West sidewalk formwork and utility install • Southwest approach barrier and sidewalk work • Marine fender wood installation • Lovejoy walkway pile cap formwork
  4. G

    South Boston Innovation Campus | 4 Harbor Street | Seaport

    breaking out the second phase https://handelarchitects.com/project/4-harbor-life-sciences-center site: https://www.google.com/maps/@42.3460996,-71.0364281,168m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI1MDEwMS4wIKXMDSoASAFQAw%3D%3D...
  5. G

    Bill Russell Bridge | North Washington St.

    North Washington Street Bridge Construction Update The Construction Look-Ahead through January 4 for the North Washington Street Bridge is as follows: Scheduled Work • West sidewalk formwork and utility install • West pedestrian handrail installation • Southwest approach barrier and...
  6. G

    60-80 Cross Street | North End

    Is this the same site? North End Piazza on The Greenway | 198 Hanover Street | North End
  7. G

    401 Park Drive (née Landmark Center) | Fenway

    is there an entire separate building going in on the corner (based on what appears to be foundation work in IMG_7097)?
  8. G

    ISQ3 | 22 Drydock Avenue | Seaport

    nice shots, beeline! did you happen to see if the South Boston Innovation Campus parcel has a fully developed "park" and parking lot at this point?
  9. G

    🔹 What's Happening With Project X?

    and these? Housing on D Street | Massport Parcel D4 | Seaport Reserved Channel Development | 300 West First Street | South Boston Channelside (née P&G) | 244-248 A Street | Fort Point
  10. G

    🔹 What's Happening With Project X?

    updates? EB80 | 80 East Berkeley | South End Boutique Hotel at 88 North Washington St | Bulfinch Triangle | West End Cambria Hotel | 104 Canal Street | Bulfinch Triangle Oxford Office Bldg. | 125 Lincoln St | Leather District
  11. G

    🔹 What's Happening With Project X?

    i'd like to know the same. i'm guessing this design is contingent on this project finishing first: https://archboston.com/community/threads/north-station-charles-river-draw-tower-a.5333/page-12
  12. G

    Seaport Square (Formerly McCourt Seaport Parcels)

    perhaps it's a sign that focus may shift to the long overdue Parcel D? or easy to complete Parcel N?
  13. G

    One Harbor Shore Dr. | Fan Pier Parcel H | 1 Harbor Shore Drive | Seaport

    Back in the 20-teens, I wondered who'd win the race to fully develop their "neighborhood": Fan Pier, Boston Landing/New Balance Complex, or Assembly Row. Obviously Fan Pier is going to win out; Boston Landing/New Balance Complex still has the hotel parcel remaining and Assembly Row still has...
  14. G

    North Station Gateway | 251 Causeway St | Bulfinch Triangle

    I wish focus was less on rebuilding the "general area" which is already developed and more on filling in the 7 (as I count) surface parking lots throughout the rest of Bulfinch Triangle.