Recent content by intellirock617

  1. intellirock617

    Rose Kennedy Greenway

    According to this sign, a 4-story 2-family residence.
  2. intellirock617

    Rose Kennedy Greenway

    Helical Piles being installed at 43 Stillman St on 8/11/22
  3. intellirock617

    Rose Kennedy Greenway

    As noted in the abutters meeting, its going to be the personal home for the owners of the Lupoli Companies https://www.lupolicompanies.com
  4. intellirock617

    Rose Kennedy Greenway

    Construction activity at 43 Stillman St (also referred to as 0 Stillman) has started and stopped. Work initially began on July 21st carried out by utility contractor Ronan 953. A Stop Work Order was spotted on August 4th. 4 /url] [url=https://flic.kr/p/2nCiZsk]
  5. intellirock617

    Rose Kennedy Greenway

    Unsure where exactly these go, but since they were along the Greenway ... here we go. 128-134 North Street, the former Traffic Tunnel Administration Building, has been sold. This abuts the North Bennet Street School located at 150 North Street. 128-134 North Street Abutters Meeting They want...
  6. intellirock617

    Bulfinch Triangle Infill & Small Projects

    155 Portland St Abutters Meeting Proposed 9 story addition to the Onyx Hotel at 155 Portland St.
  7. intellirock617

    Bulfinch Triangle Infill & Small Projects

    Poshtel 7/14/22 Friend Street Poshtel (7/14/22). Roof work ongoing and soil test drilling in the next lot. Poshtel 7/21/22 7/21/22
  8. intellirock617

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    The commute today turned from holding at stations on the OL due to a "disabled train being switched tracks at North Station" to "No Service Between North Station and Back Bay ... take the Green Line to Copley". When the initial MBTA tweet came out, I had asked a Transit Ambassador on the train...
  9. intellirock617

    Green Line Extension to Medford & Union Sq

    6/22/22 Old Lechmere Demolition Progress Old Lechmere 06.22.22 Old Lechmere 06.22.22 Old Lechmere 06.22.22
  10. intellirock617

    Union Square D2.1 | 10 Prospect Street | Somerville

    6/22/22 USQ 06.22.22 USQ 06.22.22 USQ 06.22.22 USQ 06.22.22 USQ/MBTA 06.22.22
  11. intellirock617

    Boynton Yards | 99-101 South/808 Windsor | Somerville

    6/22/22 Excavation progress at 153 South St Boynton Yards 06.22.22 Boynton Yards 06.22.22 29 Harding St (Former Gentle Giant building) Demolition Placard issued 6/7/22. Demolition equipment has been mobilized. Abatement and strip-out are ongoing in the rear of the building. 29 Harding St...
  12. intellirock617

    Boynton Gateway | 495 Columbia Street | Somerville

    6/22/22 Excavation continues. Bracing being installed. Boynton Gateway 06.22.22 Boynton Gateway 06.22.22 Boynton Gateway 06.22.22
  13. intellirock617

    401 Park Drive (née Landmark Center) | Fenway

    6/15/22 Demolition nearing completion
  14. intellirock617

    Fenway Center (One Kenmore) | Turnpike Parcel 7, Beacon Street | Fenway

    http://buildp7.com The official site is a little sparse. There's maybe a week or so left of drilling left. One rig has already been demobilized and taken off-site. After all the drilling is done, they need to excavate and cut the piles before rebar work can occur for pile-caps. Any supporting...