    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    Wait, are you saying the Transit Matters report is saying Amtrak needs to switch over to EMUs? Nothing in the report seems to indicate that to me. The only references to EMUs in the report are all about MBTA operations, and Amtrak is only referenced a few times, never in that context. Amtrak...
  2. U

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    Ignoring the fact that new stations are currently being (badly) designed and not reserving a third track in that area, and assuming it's possible to carve out a third track through here, would there be any benefit in an express track that is rated at 90mph? The stretch from Auburndale to the...
  3. U

    Design a Better Franklin Park

    Honestly they just need to keep redoing their existing exhibits to remove the chain link fences. The giraffe area is great in part because it's partially hidden from the main path by vaguely-correct-looking grasses, and you're separated from the animals by a wooden fence. Many of the other...
  4. U

    Green Line Type 10 Procurement

    It's a somewhat common scheme over on the Design a Better Boston subforum. You basically have two different systems at that point. A streetcar system fed from Kenmore and a light rail system fed by the outer tracks at Boylston that connect to some new subway to the south. That way you reduce...
  5. U

    Green Line Type 10 Procurement

    That aisle looks awfully narrow. Which section is that?
  6. U

    Site Issues

    Even a basic Patreon would probably at least cover some of the hosting costs, and I know I'd throw a few bucks at it. Despite the fact that this isn't a non-profit type, charity situation, I think the site provides enough of a resource to be worth supporting. How does making the site not...
  7. U

    Logan Airport Capital Projects

    Given that passenger numbers are approaching pre-pandemic levels, is bringing back the APM plans a good move? Has there been any talk of that at any relevant meetings recently? Better rapid-transit connections would definitely alleviate some of the parking concerns.
  8. U

    Other People's Rail: Amtrak, commuter rail, rapid transit news & views outside New England

    Be the Shore Line East Propose leaving the shoreline and heading inland Shaking my head
  9. U

    Crazy Transit Pitches

    RE: Terminal station placement. I think it's a given for this project that you need to be tunnelling under the terminal buildings themselves, otherwise none of this works. That said, could we share terminals for E/C and A/B? I make this out to be ~800 ft radius between the two terminal stations...
  10. U

    Crazy Transit Pitches

    I know we're talking in the hypothetical of a hypothetical of a hypothetical of a hypothetical (I think there's actually one more layer here, given that NSRL doesn't actually exist yet), but I would push back against running express through Chelsea. People in Chelsea deserve better connections...
  11. U

    Crazy Transit Pitches

    I guess my question is: Is the cost of a TBM for that length worth it when we can probably get away with reusing the existing ROW and then a much shorter (probably doable without a TBM) tunnel segment under Chelsea Creek and 1A. It's a longer trip, but it seems like it would save a lot of money...
  12. U

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    On the one hand, hopefully any work they do can leave provisions for a station down the line (maybe even with room for an express track??), but on the other hand I'm not sure if there were any substantial changes from any of the other studies going back to 2006, so maybe it's good they're not...
  13. U

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    It doesn't look like the past studies they link to mention anything meaningful about the commuter rail at all, so I would lean towards "no" and that it's just studying what to do about the supercollider. EDIT: Amusingly, the 2006 study goes as far as to completely remove the tracks from the...
  14. U

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Curiosity? That's my question? How much is this actually costing (from both a capital and operational perspective) and how much would it cost to fix?
  15. U

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Random questions: The Blue Line runs dual-mode (catenary and third rail) because of how close it runs to the ocean. Is this an actual issue that can't be overcome? What are the costs (operation and capital) to this? Could we switch to single-mode if we make some changes to the tracks? Has...