Roux Institute Campus Development | Portland

If that two-story section gets a roof deck, that's going to be gorgeous in the summer! Assuming the wind isn't coming off the sewage plant, at least.
One of the images on the architect's site has it as a green roof with trees and people walking through it.
 
Screenshot 2026-05-15 at 7.02.31 PM 2.png
 
Is there anything barring Roux from painting the old B&M Building?

I'd rather the building had been demolished, but obviously got some kind of historic landmark attribution.

I was thinking it might not look "as bad" if they painted it a solid color ... black, dark blue, bright white, idk ...
 
I don't believe the B&M building is officially historic, but it appears that Northeastern has chosen to preserve it in a way that's substantially similar to the factory that a lot of Portlanders had an attachment to, whether because they worked there, or smelled the ovens regularly, or had a certain amount of civic pride that such a major brand was made here.
 
I don't believe the B&M building is officially historic, but it appears that Northeastern has chosen to preserve it in a way that's substantially similar to the factory that a lot of Portlanders had an attachment to, whether because they worked there, or smelled the ovens regularly, or had a certain amount of civic pride that such a major brand was made here.
Ah - I thought they were required to keep it, as the first development renderings didn't include it. All before they were also forced to scale down the height of their proposal as well.

I think it'd be cool - with new black windows ... to flip the colors on this building. Paint it dark blue or black and the top "decorative" (if we can call it that) detail white so it pops.
 
The integration and yet contrast of the old and new buildings with different functions enhances each. I like the pathway in between leading to the marina. This will undoubtedly become a nationally known build and school. If Redfern breaks ground this summer at the Northern Burner location, that's about the time needed (18 months) to complete new housing for students (360 apartments). I spoke with someone at DOT and he said the connecting footbridge adjacent to Tukey's Bridge would not be done until the summer of 2028. Hopefully, that's the case for biking and walking to and from Washington Ave.. An E-Bike would be 5 minutes and walking 10-15 minutes.
 

Back
Top