TC_zoid
Senior Member
- Joined
- Apr 16, 2014
- Messages
- 1,726
- Reaction score
- 2,773
Going down the middle of 95 in between the three lanes with one track. There is just enough room to do this, and if a few more feet are needed to satisfy DOT then one side of lanes could be re-striped. A break-down lane can be reduced to less than half its normal width. It's not unusual to see this, or certainly in Boston. Maine? I don't know. Three bridges would need the center support moved to the ends with some center reinforcement. It's not an engineering marvel here, but some substantial tweaking, yes. The problem with a new station sets the city back to a station center that is underwhelming and will not increase ridership, but reduce it due to isolation and serious safety concerns. PTC is a busy place now with both buses and trains. It needs expansion and could use a food court for increased revenue. A big parking garage and waiting area could be built on the other side of the tracks with a connecting bridge. A new station next to the Tyson factory and that isolated and off putting industrial area is going back in time, in effect to what the old Greyhound terminal presented in a former gas station. A transportation terminal is a gateway to the city and anything depressing is a first impression. "You never get a second chance to make a first impression."Because there is no longer a median on that stretch of 95. It was removed as part of the widening to three lanes. It would thus require additional widening to maintain DOT standards. You're adding SIGNIFICANT cost at that point.
Last edited: