Search results

  1. BosMaineiac

    New Red and Orange Line Cars

    The orange line being “done” was never the intention of the shutdown. The intention was to work on emergency repairs and complete “5 years of work in a month”. Was that accomplished? Probably not, but the backlog of deferred maintenance on the OL and the MBTA as a whole is substantial...
  2. BosMaineiac

    MBTA Construction Projects

    You could have some sort of gutter attached to the elevator carriage that opens to let *liquids* drain out at each level
  3. BosMaineiac

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    What year is this from? Has there been any movement on a station here or at least the highway reconfiguration in recent years?
  4. BosMaineiac

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    It looks like there would be enough room where this office building is, although the wetlands may prove difficult to build over/around. You would also need to redesign the interchange slightly to have access ramps, so it may be getting into more crazy transit pitch territory. I think...
  5. BosMaineiac

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    A new park and ride station on the Fitchburg at Waltham/Route 20 could solve this problem
  6. BosMaineiac

    Acela & Amtrak NEC (HSR BOS-NYP-WAS and branches only)

    I personally think that the Glass MSG would be a cool, modern looking option. That would probably be the best use of space as the footprint would be much smaller than the 1910 built (which is a pretty ridiculous thing to want to do imo). Never mind the through-running as that just seems way too...
  7. BosMaineiac

    Green Line Extension to Medford & Union Sq

    If we’re doing a straight cost per mile comparison for two wildly different projects, GLX is $530M/mi and CrossRail is $1.73B/mi
  8. BosMaineiac

    Green Line Extension to Medford & Union Sq

    Where did you get this figure?? Last I checked CrossRail cost $24Bn :LOL:
  9. BosMaineiac

    Potential Soccer Stadium | Portland peninsula

    The link I sent on the last page shows the renderings for a renovated Fitzy for soccer. That’s the plan afaik but no word on a timeline. I’m sure the soccer group that’s pitching it is hoping the city/state pitches in
  10. BosMaineiac

    Potential Soccer Stadium | Portland peninsula

    USM has a fairly large rink with an Olympic-sized ice surface on their Gorham campus. all of their athletic facilities are located there.
  11. BosMaineiac

    Potential Soccer Stadium | Portland peninsula

    The city put the kibosh on this location for the reasons you mentioned about the storm water tanks. I doubt they even put provisions in place for a foundation to support a structure, especially one of that size...
  12. BosMaineiac

    Portland Bayside

    My dream crazy-transit pitch for Portland is a light rail line running down the Union Branch to the waterfront, street-running down Kennebec/Somerset St and then in the median of Franklin St (I’m pretty sure I’ve posted it on this forum before). I’m happy they’re converting the old dump plots to...
  13. BosMaineiac

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Technically the 4-track CA/T requires two tunnels. It would take two 41’ diameter bores with two tracks each. I’m not sure if there’s a boring machine large enough to hold 4 tracks but there might be. Does anyone know if Crossrail or East-Side Access had 4-track single bores and if that would be...
  14. BosMaineiac

    MBTA Buses & Infrastructure

    That’s not a bad idea. I wonder if they’re just banking (praying) on battery technology improving enough to make those obsolete. It definitely would’ve been worth a pilot program though
  15. BosMaineiac

    MBTA Buses & Infrastructure

    Couldn't a bus lane do the trick?
  16. BosMaineiac

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    The thing with a boring machine is that it goes through bedrock so there aren’t any concerns with building foundations. The last study found there’s enough space to get from the Back Bay portal to the Congress alignment, but the CA/T alignment was the only option with a South Bay portal. The...
  17. BosMaineiac

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    That’s correct, both of those alignments can only handle 2 track. CA/T’s the only one that can fit 4
  18. BosMaineiac

    The Casco | 201 Federal Street | Portland

    One can only dream of a Middle St subway :LOL:
  19. BosMaineiac

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    I think that two station solution (SS and Haymarket/State) would necessitate the South Congress or Pearl Congress alignment
  20. BosMaineiac

    MBTA Buses & Infrastructure

    Depends on what you mean by contract. The T put out a procurement bid for the first round of BEB’s last year and were expected to announce the winning bid by the end of last year, but I haven’t heard anything. They currently have 5 New Flyer BEB’s in use on the Silver Line, and I suspect that...

Back
Top