Search results

  1. A

    Post-Covid Travel Patterns and Solutions

    I'm seeing things similar to what folks have noted: Traditional car commutes are "back" Tuesday-Wednesday-Thursday, but, less congested Mondays and Fridays Local arterials and highways seem to be pretty crowded during commuter hours Other things that I've noticed Busy roads from leisure trips...
  2. A

    Crazy Highway Pitches

    Sometimes I wonder if a highway busway or HOV conversion would satisfy some of the upper middle class northwestern burbs. I know that the folks further up Route 2 seem to constantly say they want highway "BRT".
  3. A

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    The workers also need the breaks. I think productivity slipped on the OL shutdown as the weeks went by because there was no recovery time for the workers. I also think that the holidays would result in (1) a lot of call outs and (2) long term disgruntled workforce.
  4. A

    River Street Redesign | Cambridge

    Worse - that formerly busy plaza looks barren. I wonder why the bus lane doesn't start back at Memorial Drive. Seems awfully inconsistent.
  5. A

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I'm still wondering what the point of the referendum to add a billion to the tax rolls was....if the Commonwealth's electeds are going to just overturn it.
  6. A

    Union Square Somerville Infill and Small Developments

    On walk to Market Basket, I think there was a sign that said the alley was open space.
  7. A

    Union Square Somerville Infill and Small Developments

    But from Lake Street, iirc.
  8. A

    Green Line Extension to Medford & Union Sq

    At this point I have no clue if I should laugh or cry.
  9. A

    Green Line Extension to Medford & Union Sq

    I think the issue isn't necessarily just the work on the tracks itself but all the other potential emergencies that may hit the system at the same time. Any additional flexibility in supporting MBTA staff from power, tracks, management, etc need to pivot to respond to anything happening with the...
  10. A

    100 Chestnut Street | Inner Belt | Somerville

    Interesting - quite a find. There are very few things that I've heard people refer to in "Brickbottom" as defined here: U-Haul, Mercedes-Benz, ArtFarm, and .... maybe Cataldo? I wonder if these businesses (and future city community center) could be convinced to brand as "Brickbottom"...
  11. A

    100 Chestnut Street | Inner Belt | Somerville

    That would be how I would describe the area too. I just know as a transplant that there are also long established histories of names for places that people so get very particular about too.
  12. A

    100 Chestnut Street | Inner Belt | Somerville

    General location question: I thought the location of this would be "Brickbottom" instead of "Inner Belt"? My impression, perhaps incorrect, was that the section b/w McGrath and the New Hampshire main line/Green Line extension was Brickbottom (maybe including the part north of Washington?)...
  13. A

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I think this is as much a function of the other development that has happened in the area as well not just the housing. Also, the SL3 opened in 2018 and the housing and transportation shifts take some time to result in changes to ridership. From what I hear the SL3 to Seaport ridership is pretty...
  14. A

    MBTA Construction Projects

    I've felt like the section of the lobbies before the faregates could be made much larger at both headhouses. I'm disappointed that the lobbies here aren't being significantly expanded during the planning to redevelop these sites. It would be much easier to manage the crowded platforms here (even...
  15. A

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Took the Green line out to the ends of the GLX a couple times this week, as well, and I saw one indicator that speeds and travel times may be getting better: waiting several minutes for a platform to open up to allow an incoming outbound train to berth at Union and Medford- Tufts. Perhaps...
  16. A

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I rode through a couple times this work week. While the squeal was still there, it was very much quieter as far as I could tell from inside the car. I don't know how it was on the platform where the cavernous tunnels seem to amplify and concentrate the sound toward the humans on the platforms...
  17. A

    Green Line Extension to Medford & Union Sq

    That is a temporary measure until the phase of the AFC2/Fare Transformation project where they begin doing on-board GL fare collection.
  18. A

    Green Line Extension to Medford & Union Sq

    My understanding is that the GLX stations will be treated like the surface stops on the western branches. That means, a rider taps on boarding rather than at a fare gate line.
  19. A

    New England Revolution Stadium | 173 Alford Street | Boston-Everett

    i thought the bridge from Draw 7 to Casino was already in the works? I suppose the remainder is a bridge from the north head house down to the Draw 7?
  20. A

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I looked through the document and it's really disheartening to see that they cannot give an accurate narrative. It would be accurate to say we have $25bn of assets that are out of a state of good repair *and* to also say that there are $x bn in projects that are addressing the state of good...

Back
Top