Search results

  1. R

    Reasonable Transit Pitches

    A couple of points: Restoring the grade crossing in Arlington Center would not be popular with the locals. Most of the bridges have been rebuilt to be bike path only, even if the abutments still have space for two tracks. Bike path users and abutters would react violently to the prospect of...
  2. R

    15-25 Harrison Ave | Chinatown

    The offset windows and the red penthouse need to go.
  3. R

    Shreve, Crump & Low Redevelopment | 334-364 Boylston Street | Back Bay

    I know it’s still under construction, so the backdrop is dark steel instead of a lighter interior. However, I don’t think that accounts for all the difference between the render and reality.
  4. R

    South Station Tower | South Station Air Rights | Downtown

    That’s not its most flattering angle. The bulk of the office floors ruin the slender gesture of the residential floors.
  5. R

    Shreve, Crump & Low Redevelopment | 334-364 Boylston Street | Back Bay

    Walking by it today, there is something about the glass that is deadening. It doesn’t reflect the adjacent buildings or sky well, and it doesn’t have the transparency of something like the Apple Store cube.
  6. R

    Idea for fixing the housing shortage

    In the US, housing is simultaneously the bulk of the wealth for many families and the primary means of moving between rungs of the social ladder. Families don’t want to risk losing their place on their ladder. Families also don’t want to risk losing their wealth, because there is no true safety...
  7. R

    Metropolitan Water Tunnel Program

    Lack of drinking water and the specter of sewage backing up into houses has a way of galvanizing support for such projects. Transit is considered optional by those who can afford avoid using it.
  8. R

    Arsenal Yards | Arsenal Mall Redevelopment | Watertown

    Someone stole the plans for Assembly Square Block 7A.
  9. R

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    So 2028 is probably the drop dead date for choosing to renew the OCS or scrap it.
  10. R

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    The cars are approaching 20 years old, so I assume the replacements will go out for bid in 2-3 years.
  11. R

    AstraZeneca/Alexion | 290 Binney Street | Kendall Square

    The overlay looks like it was stolen from a 60s split level. Maybe they’ll fill the lobby with macrame wall hangings.
  12. R

    kz's Wanderings Around Greater Boston

    Someone should stage one of these 80s vintage houses with a gigantic CRT TV, VCR, and Hi-fi setup.
  13. R

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I assume they are going to build an incline accessed from the end of the parking lot at the playing fields. If they do it correctly, it will be a tangent to a potential RLX.
  14. R

    Union Square Somerville Infill and Small Developments

    A few projects on Prospect St.
  15. R

    New England Electrical Grid

    Slow progress on the Prospect St Substation.
  16. R

    Suffolk Downs Redevelopment | East Boston/Revere

    How deep was the 100-150 Salt excavation before they shut off the pumps?
  17. R

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I thought the MBTA had programmed some money to evaluate running full third rail.
  18. R

    Arsenal Yards | Arsenal Mall Redevelopment | Watertown

    Lab employees living in the burbs don’t want to worry about parking.
  19. R

    MXD Residential Tower | 121 Broadway | Kendall Square

    I think the slurry wall is just enclosing the substation. The residential tower has a distinct foundation.
  20. R

    kz's Wanderings Around Greater Boston

    The pool picture has late 80s pre-teen birthday party vibes.

Back
Top