Search results

  1. johnmcboston

    New Red and Orange Line Cars

    It was media day today, so probably open just so folks can check them out. Can't imagine the T would want that kind of liability. https://www.wcvb.com/article/first-look-aboard-the-mbtas-new-red-line-trains/29725138
  2. johnmcboston

    MIT East Campus - Kendall Square Gateway | Cambridge

    Subway ad today that this Roche brothers is hiring. Potentially opening soon?
  3. johnmcboston

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    If it is an unexpected need, they do indeed steal from other bus lines. Depending on how long they may need to bus, then extending to the other options you mentioned. Planned bustitutions are much better planned. Much as we complain about breakdowns, they don't have a pool of drivers and...
  4. johnmcboston

    SUPERCEDED MXD | Kendall Square

    well, curbing is in, and they were pouring the cycle track this past week. So maybe soon? Occupancy is Nov 1, so it can't be that long until the crosswalk returns to normal....
  5. johnmcboston

    MXD II (Google Kendall) | 325 Main St. | Kendall Square | Cambridge

    It is cool watching the building being deconstructed....
  6. johnmcboston

    XenForo Update

    hmmm. I unwatched and re-watched a thread and it gave me an email option. We'll see what that brings me :)
  7. johnmcboston

    XenForo Update

    Just realizing I'm not getting my daily email of threads I've subscribed to. Is that a feature that may come back at some point? In this new scheme, when I watch a thread, what does that mean?
  8. johnmcboston

    archBOSTON Update: A New Dawn

    Seems to have worked...
  9. johnmcboston

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    The orange line cars are a great example of this. At any point they could have done a long interview with any of our TV stations, inviting them in and giving a detailed explanation of what the 9+ months of delays have been - describing what needs to be fixed/tested. Instead we get a generic...
  10. johnmcboston

    New Red and Orange Line Cars

    CVB reports the trainset only did 3 round trips and was then pulled form service so the data can be analyzed. No word on when it will re-enter service.
  11. johnmcboston

    New Red and Orange Line Cars

    And a really strange font...
  12. johnmcboston

    New Red and Orange Line Cars

    According to the T, to train more operators. (Assume running them on the yard lead or track 61)
  13. johnmcboston

    New Red and Orange Line Cars

    That sequence has them going the wrong way south down a one way street - almost as if heading to Cabot yards. A long way from Wellington.... Edit: Twitter does indeed have a photo of two OL cars in the RL Cabot storage yard...
  14. johnmcboston

    MIT East Campus - Kendall Square Gateway | Cambridge

    Unlikely, as being without an elevator is a no go - especially since Kendall elevator is currently acting as a replacement for the Central elevator, which is out of service.
  15. johnmcboston

    MIT East Campus - Kendall Square Gateway | Cambridge

    Group question - are we also discussing the Coop building here? Can't see it on another thread. Was thinking about that as the plans for new Inbound red line headhouses was posted here, and was curious what they will do with the outbound head house when demolition starts...
  16. johnmcboston

    Proto | 88 Ames St | Kendall Square | Cambridge

    Well, this morning was interesting. The new configuration of Ames street, proto block, depends on the pavement markings being visible - which they are not due to snow. So this morning we had cars going form Main to Broadway, driving down the bike line (plus cars going down the regular travel...
  17. johnmcboston

    Longfellow Bridge update

    OK, let's hop over to the other side of the bridge. Looks like they're putting some kind of lagoon in. The stairs off the bridge go on some elevated path across this body of water; and a retaining wall with notch looks like something that might be in your back yard hot tub. Anyone know...
  18. johnmcboston

    SUPERCEDED MXD | Kendall Square

    Windows starting to go in at 145. Instead of the nice blue seen in the rendering (see first post) they look like the same drab windows in all the other Kendall buildings...
  19. johnmcboston

    Proto | 88 Ames St | Kendall Square | Cambridge

    Crane is coming down this weekend. On Friday a self erecting crane had already begun disassembly.
  20. johnmcboston

    Proto | 88 Ames St | Kendall Square | Cambridge

    Right around the corner they've set up a leasing office and 'demo' kitchen, in the lobby of 90 Broadway.

Back
Top