Search results

  1. ceo

    MBTA Construction Projects

    Sure wish they'd do that at Sullivan, so you don't have to walk under an underpass and up a driveway to get to the entrance. It's like the designers had no idea East Somerville existed.
  2. ceo

    Green Line Extension to Medford & Union Sq

    It's a similar situation at Magoun Square; the long walkway is so the tracks have enough distance to come back together before the bridge. Same at Medford/Tufts, it's why the station entrance is on Boston Ave instead of the College Ave bridge.
  3. ceo

    MBTA Buses & Infrastructure

    I would like to call for a nationwide ban on the phrases "on track" or "derailed" when referring to rail or transit projects.
  4. ceo

    Memorial Drive Greenway Phase III

    With regard to the project to JFK St, I'm really glad they're getting rid of the parking on Memorial Drive westbound. That's always struck me as insanely dangerous.
  5. ceo

    New England Electrical Grid

    You're going to lose heat during a blackout anyway. I'm contemplating adding solar and converting to full electric, but one of my biggest hesitations is no longer having a functioning stove and water heater during outages. We almost never lose power, however.
  6. ceo

    Green Line Extension to Medford & Union Sq

    And there's a handy sign with the times the commuter rail goes by.
  7. ceo

    Green Line Extension to Medford & Union Sq

    The narrator states that they're now having every E train deadhead out to Union and back. Which of course means the Lechmere Viaduct is open for business again; originally they were testing with a couple of vehicles they'd trucked over to the maintenance facility. It does raise the question of...
  8. ceo

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I can't quite tell from the photos, but isn't that the same elevator that was there already? (And aren't they going to have to add another one now?)
  9. ceo

    General Infrastructure

    I think you've hit on the real problem with Wellington Circle, which is that Fellsway (and MVP to a lesser extent) splits into two widely-separated roadways, making the whole thing much more complicated than it has to be. If you make them single roadways it can be a simple (if large) signalized...
  10. ceo

    Green Line Extension to Medford & Union Sq

    In the early planning phases, they were making noises about serving Ball and Magoun Squares via a single station at Cedar St. Which would have been incredibly inconvenient for anyone who didn't live on Cedar St, and the idea was quickly dropped. Excellent photos, thank you for doing this!
  11. ceo

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    A shared-use path at least from West Medford to the MVP station would be a really useful thing. It's just over a quarter mile, but by existing roads it's almost twice the distance. Probably have to build a separate bridge for it though.
  12. ceo

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    I vaguely remember F-Line saying that the only low-clearance bridge on the system that can't be modified to allow for catenary is the Memorial Drive bridge over the Grand Junction, which isn't used in revenue service.
  13. ceo

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Too much to hope that the Sullivan Square upgrades would include a new headhouse on the East Somerville side.
  14. ceo

    Assembly Sq <-> Casino Footbridge

    I'm confused by the video you linked to... you can't put a one-piece prefab bridge down across the locks, because boats still have to get through. A crossing via the AED would have to involve walkways on top of the lock gates like the Charles River Dam, which are 1 person wide with sharp bends...
  15. ceo

    North Station, Charles River Draw, & Tower A

    They'd have to have some sort of ventilation, for fires, but the NSRL does presuppose electrification. For one thing, the grades required on the approaches are too steep for diesel-hauled trains.
  16. ceo

    MBTA Red Line / Blue Line Connector

    And having said that, yes, we should be talking about the shambling reanimated corpse of the Red-Blue Connector on this thread. A thing I found particularly interesting is that they ruled out using a TBM because they'd have to grout the hell out of the soil in front of it and it would cause just...
  17. ceo

    MBTA Red Line / Blue Line Connector

    Quite a while back, F-Line claimed that the center tracks of the North Station storage yard, in between the running tracks as they curve west to ascend to Science Park, were intentionally designed to provide for a future riverfront branch. I think he's flat-out wrong on this, the ramps for the...
  18. ceo

    Green Line Extension to Medford & Union Sq

    Everything I've been hearing lately is that Medford Street will be fully reopened to traffic.
  19. ceo

    Commuter Rail to New Hampshire?

    Possibly peak-hour Lowell-Boston expresses would be too disruptive of the rest of the schedule. I'm purely speculating here.
  20. ceo

    Green Line extension Newton to Needham

    The Fast 14 approach only works for replacing the span on existing abutments. Widening the ROW requires replacing at least one abutment.

Back
Top