Search results

  1. dhawkins

    Other People's Rail: Amtrak, commuter rail, rapid transit news & views outside New England

    Jeez, just another thihg NYC has to be better at than Boston. We build the Green Line ext at 600,000,000 per mile and they have to up the ante to 4.3 billion per mile of track.
  2. dhawkins

    Metropolitan Storage Warehouse Redevelopment/Renovation (MIT) | 134 Mass. Ave | Cambridge

    The heavy storage construction method before concrete waffle slabs. The Park Street station ceiling has similar vaulting to hold up he soil and traffic above it.
  3. dhawkins

    Raffles Boston (40 Trinity Place) | 426 Stuart Street | Back Bay

    I got to check out Raffles last night thru a friend in the travel industry. Nice finishes through out. Lots of ceramic tile floors, not porcelain, plush carpets and high end wall coverings (not vinyl). I believe real wood veneer on all paneling as well! There is plenty of staff available. Two...
  4. dhawkins

    🔷 Open Thread

    I was intrigued by the question regarding Church Park and the demolition of the theater. My first apartment was at Mass and Ave and Columbus so the plaza was my outdoor space. I enjoyed it very much and knew it was part of an I.M. Pei master plan but never thought of the history of what was torn...
  5. dhawkins

    Mission Hill Parcel 25 | Tremont St @ Roxbury Crossing

    I'm liking it beter than the tan and brown suburban clapboard look that have been springing up around the site. The facade could use more breaking up. Hopefully they can rework the materials a bit and end up with a less ominous wall of metal along the length of the building. Something like...
  6. dhawkins

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    It seems the MBTA has been on the fiscal cliff since the year 2000. I think the debt is a shell game and hopefully Tibbetts-Nutt has political savvy to wade these waters; otherwise she will be a sacrificial lamb next summer/fall.
  7. dhawkins

    CambridgeSide Galleria Reno/Redev | First Street | East Cambridge

    Cleaning up the punchlist items on the exterior. The corner above the garage entry is getting tidied up. Roofing in the corners.
  8. dhawkins

    USPS Complex | Fort Point

    Time for The Post Office to move over the Gillette site.
  9. dhawkins

    74M (EDGE Assembly Sq.) | 74 Middlesex Ave | Somerville

    All the cranes are gone!? How do they get the remaining panels up? Swing staging?
  10. dhawkins

    Worcester Ballpark & Redev

    Do you think Holy Cross or UMass will buy it and honor the Woo sox lease? It would be a great start for a new campus
  11. dhawkins

    Washington Village | Andrew Square | South Boston

    It doesn't matter, get them built to get a foothold on these wastelands of old industrial lots; get them cleaned up and built on! Then in 30 years when the property has gained value and the buildings are sold off to new developers, the buildings will be remodeled or torn down and rebuilt. This...
  12. dhawkins

    New England Revolution Stadium | 173 Alford Street | Boston-Everett

    It's going thru the legislative process as we speak/type. A link to yesterdays goings on the Hill. House, Senate at odds on shelter spending, Everett soccer stadium Senate leaders optimistic differences can be resolved quickly
  13. dhawkins

    Cambridge Infill and Small Developments

    Impressive digging. I do appricate the corner windows are being returned to somewhat their original mullion layout in the new renovation. I know of one building that has maintained their original 1920s steel frames of this corner type window. (I should post this on the "Where am I" thread)...
  14. dhawkins

    Flickr Finds & Social Media Pics

    What is this nonsense!? Is it April 1st or something!?
  15. dhawkins

    401 Park Drive (née Landmark Center) | Fenway

    Still working on setting rebar at the first floor since the beginning of October! Looks like they set the crane base as well. Hopefully they can pour the first floor before winter sets in. It can act as a roof area to enclose the garage levels below where they can work thru the winter.
  16. dhawkins

    Fenway Center (One Kenmore) | Turnpike Parcel 7, Beacon Street | Fenway

    Looks like some work has started at the Brookline Ave bridge side of the project as well on both sides of the turnpike. Bonus pic, a rendering of the finish product seen in the wild. Looks like the Buckminister is still remaining.
  17. dhawkins

    Fenway Center (One Kenmore) | Turnpike Parcel 7, Beacon Street | Fenway

    Steel and deck progreesing nicely. There was a question of what the finish product would look at the columns where the rebar was flanking both sides. There is a finish condition across the street/ turnpike in the last picture. The wall is the same height as the column on both sides, the gussett...
  18. dhawkins

    Lab/Office | 109 Brookline Avenue | Fenway

    Two more floors of steel underway. Thats a lot of steel within a week.
  19. dhawkins

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Last rendition I can find. from 2017. Looking from the pedestrian bridge in the park, I think the 20 Childs Street residence is the one in the back/ middle with Parcel L&M immediately to the left.

Back
Top