Search results

  1. S

    New Red and Orange Line Cars

    Could swear I saw some Red Line ones sitting north of the Broadway Bridge last time I ran over, but I didn't stop for pictures. That was about a week ago. But it's too soon for that, right?
  2. S

    Cambria Hotel | 6 West Broadway | South Boston

    Found this: So maybe it's still part of the emergency training they do there?
  3. S

    Cambria Hotel | 6 West Broadway | South Boston

    Still can't figure out why it works sometimes and not others. But I'll try and use two browsers until the new overlords give us an image hosting solution. Here are the rest:
  4. S

    Cambria Hotel | 6 West Broadway | South Boston

    The sidewalk is open: There's also a new, right-angled crosswalk to Broadway Station that should help if they ever make that change to the 9 bus route and drop people off on this side. Still not clear on why there couldn't have been a Red Line entrance on that side...
  5. S

    Fort Point Infill and Small Developments

    The full tracks are open now: Of course then you get here, and well, good luck:
  6. S

    The New Retail Thread

    For my penance, actual photos:
  7. S

    Ink Block (Boston Herald) | 300 Harrison Avenue | South End

    And half that stuff is still sitting on the basketball court. Not that I think anyone is pining the loss of half a basketball court under a highway. I'm glad the place is prettier but I really don't want to linger around there inhaling car exhaust.
  8. S

    The New Retail Thread

    You're saying I can't trust everything I see on Twitter?
  9. S

    Biking in Boston

    I think the original plan was to stay on the Connector side (as reflected in Henry's image), but they changed it to Albany St.
  10. S

    The New Retail Thread

    Yes, and they have a Coming Soon sign hung up.
  11. S

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I haven't seen much discussion of this so maybe I'm misreading, but in the Dorchester Reporter article about how long the Red Line will be slowed, there's this: I asked Jennifer Smith and she confirmed that they are saying the brand new signal project has now been moved up a year. That's great...
  12. S

    Biking in Boston

    This last bullet is the part currently being worked on. Here's the description of the project: https://www.boston.gov/sites/default/files/imce-uploads/2017-08/2017-0809_sbht_informational_meeting.pdf The nice part will be the bike lanes that form a circle between 4th and Broadway bridges, and...
  13. S

    Biking in Boston

    Some work finally being done on the South Bay Harbor Trail (the ugliest part of it, anyway, still no sign of bike lanes on the 4th St./Broadway bridges):
  14. S

    South Boston Infill and Small Developments

    The Gate of Heaven parking lot. Previously. Background.
  15. S

    Logan Airport Capital Projects

    Yeah, it's nice, and they have a lot of Boston decor:
  16. S

    Ode to Brutalism

    I got all excited by that article and ran over that way on Sunday, but if like me you were expecting a better situation at the really visible corner at Merrimac and Staniford, well: But yes, on the far side of the building, things are a little better: These are the open falls...
  17. S

    South Boston Infill and Small Developments

    A belt company used to be there. ¯_(ツ)_/¯

Back
Top