Search results

  1. FitchburgLine

    Regional New England Rail (Amtrak & State DOT & NEC)

    Violating the ADA would be another way of approaching this, yes. Or we could build mini-highs and limit boarding to 1 door per 6 car train. There are a range of bad options, all of which combine with the high operating costs of the Acela Is and crappy rolling stock design to make this a...
  2. FitchburgLine

    Regional New England Rail (Amtrak & State DOT & NEC)

    Acela cars do not (and cannot due to carbody issues) have traps for boarding at low platforms. Your proposal to have all riders do a muscle-up before boarding is unlikely to be popular with everyone, but it would certainly be an effective PR move!
  3. FitchburgLine

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    The GLX design was locked in before the Type 10s, so it was unclear if far future would demand 4 sets of existing cars, which would require 300ft. But now it’s totally irrelevant.
  4. FitchburgLine

    Green Line Extension to Medford & Union Sq

    There was no active "site" for excavation, and the was being placed on top of the line near Rogers Foam (which was the original target for the work), so I believe the critical path has advanced.
  5. FitchburgLine

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    The special permit to change Q1 from hotel to office and permit occupancy of both Q1 and R before all Phase 1A/B buildings have been completes was approved on Dec 17. This allows two more office buildings very near GLX which will potentially be the next projects.
  6. FitchburgLine

    Economic & Demographic Trends: Maine & Portland

    Great thread premise. For some basic data, Portland ME (municipal boundaries) had 66,090 residents in July 2010 and 66,417 in July 2018. So no decline (which is the norm for postindustrial cities in northern New England), but very slow growth.
  7. FitchburgLine

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    Thanks for the consolidated thread. For the B branch stop rebuild/removal, do we have any updates on construction?
  8. FitchburgLine

    Innovation Square (iSQ) | 6 Tide St. | Seaport

    Spec office with low parking ratios near transit - for a certain definition I think that counts as innovative
  9. FitchburgLine

    Amazon Office Tower I | 111 Harbor Way (Seaport Square Parcel L4) | Seaport

    I'm happy to hear requests for photos, it's not like Whigh is obligating anyone. Anyway here's today, although I didn't get the standard downward facing shot to show foundation progress.
  10. FitchburgLine

    Seaport Neighborhood - Infill and Discussion

    Really starting to come together, with the parking lots becoming isolated and streetwalls beginning to form. Even then, it’s remarkable how many parcels haven’t opened (and so aren’t contributing activity) and how many lots are left to go. In particular, there are two large parcels along Summer...
  11. FitchburgLine

    NEMA Boston | 399 Congress St. | Seaport

    Median is finished (with nothing in the way of plantings, sadly) and building appears to be open
  12. FitchburgLine

    MassMutual | 10 Fan Pier Blvd | Fan Pier Parcel E | Seaport

    Crane is up (making 4 total in the Seaport right now)
  13. FitchburgLine

    Seaport Sq. Block N | 350 Summer Street | Seaport

    Fence is up and parking ticket booths have been removed, this is U/C
  14. FitchburgLine

    How Tall Are Boston's Buildings and Should They Be Taller?

    North Station infill is happening (the hotel expansion proposed in the triangle, obviously Hub on Causeway). I think you're right but in a slightly different sense - parking lots are so under-utilized everywhere that we're primarily seeing large parking lots devleoped as the 1st wave, then...
  15. FitchburgLine

    Seaport Sq. Block N | 350 Summer Street | Seaport

    Excavators on the premises. The dewatering permit application states that the garage and back of house space will be constructed for both N and P simultaneously, so the whole site will be active soon https://www3.epa.gov/region1/npdes/remediation/noi/2019/seaport-sq-parcel-n-p-boston-mag910894.pdf
  16. FitchburgLine

    Museum Of Science Renovations | 1 Science Park | West End

    Just want to say that @Arlington has done a great job making this point re both MOS and Aquarium, and as someone who was very skeptical of the value of these garages I've been convinced both of their necessity and their limited downside (due to high rates of carpooling). My only question would...

Back
Top