  1. FitchburgLine

    Green Line Extension to Medford & Union Sq

    No pictures, but the main span carrying the Medford branch over the Fitchburg line is partially (one track worth of steel) in place
  2. FitchburgLine

    MassMutual | 10 Fan Pier Blvd | Fan Pier Parcel E | Seaport

    Could they be putting this up without a tower crane? Seems odd that a base hasn't appeared yet
  3. FitchburgLine

    MassMutual | 10 Fan Pier Blvd | Fan Pier Parcel E | Seaport

    The 2017 NPC that permitted this building changed the allowed use on H from hotel to residential, but beyond that nothing.
  4. FitchburgLine

    Seaport Neighborhood - Infill and Discussion

    The parcel for D3 (next to Omni down Summer) is just as large, and is still within a few hundred feet of the convention center. Has Massport made any indications of plans for it?
  5. FitchburgLine

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Five - Parcel J (the almost finished building), the 3 office bathtubs visible, and Parcel L (500 unit residential) U/C off to the right
  6. FitchburgLine

    Seaport Neighborhood - Infill and Discussion

    Congress St between NEMA and Echelon is getting some kind of median redo (with a cut in the middle, presumably for the NEMA entrance)
  7. FitchburgLine

    Green Line Extension to Medford & Union Sq

    The platform is U/C as 4 Type 7/8 cars long. But none of this will matter since the new GL cars will be 2/225’ and so the extensions to 300’ will never make sense
  8. FitchburgLine

    South Boston Innovation Campus | 2 Harbor Street | Seaport

    The surface lot directly above the tunnel may be unavoidable, but seriously? A second surface lot <100ft from SL Way?
  9. FitchburgLine

    Green Line Extension to Medford & Union Sq

    The EIS, which came out 1 decade before the current round of bids, is highly unlikely to have relevant cost breakdowns. The bid documents do not have a cost breakdown in the (public) technical specifications, but maybe the price scoring is FOIA-able
  10. FitchburgLine

    Green Line Extension to Medford & Union Sq

    954m base, <100m options. Not sure of internal breakdowns in the current contract, and since money is fungible any such data wouldn't mean much
  11. FitchburgLine

    Seaport Sq. Block N | 350 Summer Street | Seaport

    NPC to office approved. WS says construction is imminent on P, and test boring rig has been working at N recently
  12. FitchburgLine

    Green Line Extension to Medford & Union Sq

    Almost- the branch to the right will go nowhere for now. It’s pointed towards the yard, but the current designs connect the yard tracks to the Medford branch via a fly under.
  13. FitchburgLine

    Green Line Extension to Medford & Union Sq

    Drainage and retaining wall work (plus normal rail replacement) but I don’t recall any upgrades to it being discussed. But since speeds are already limited by geometry, not much that can be done. Outside the work zone itself, they are using weekend shutdowns to install PTC
  14. FitchburgLine

    Hurley Building Redevelopment | 19 Staniford St | West End

    I agree that if your interaction with the buildings of Boston comes from looking at photos, more interesting photos will be better. But the vast majority of people on this forum derive concrete (hah) benefits from the substantial expansion of the urban fabric post 2012. Boston is unique and...
  15. FitchburgLine

    State Street HQ | One Congress | Bulfinch Crossing | West End

    Out of 2,300 total spaces, roughly 1,100 will remain. All of the garage over Congress and towards Haymarket will be demolished, but the section between the u/c residential and u/c office buildings will remain (and be slightly expanded into the first floors of the office tower.
  16. FitchburgLine

    Seaport Transportation

    No. Rideshare is the outright majority of off-peak trips and isn’t affected by parking, and time of day data doesn’t show higher SOV utilization in the evening vs midday, when the commercial parking is still utilized.
  17. FitchburgLine

    Seaport Transportation

    Whatever your feelings on commercial parking are, it's not responsible for the drive modeshare. Seaport office commute modeshares are ~20% drive alone, which is pretty great. It's off-peak trips dominated by rideshare that are the major problem, which IMO is good reason to look at improving SL...
  18. FitchburgLine

    Seaport Neighborhood - Infill and Discussion

    In this shot: 6 buildings built this decade, 3 of the 6 remaining empty lots with active developments. Pretty remarkable to see it finally filling in
  19. FitchburgLine

    South Station Tower | South Station Air Rights | Downtown

    Also news: the BPDA board memo calls for adding the Dutch pension fund (huh) as a partner in the project.
  20. FitchburgLine

    South Station Tower | South Station Air Rights | Downtown

    BPDA extension to April 30 2020 on agenda for Thursday...