I think they mean 12’ wide. How on earth do they already have the design in one week and the funding??
EDIT: Crimson reporting it’s a 12’ wide path the entire length from the boathouse to the bridge https://www.thecrimson.com/article/2024/10/1/cambridge-bike-safety-policy-order/