Search results

  1. I

    Parcel JK | Cambridge Crossing | Cambridge

    Re: Parcel JK | NorthPoint | Cambridge *I experienced oddness with "L" vs "H" bbcode size designators for this posting. Mods, if "L" didn't append, please feel free to scale (and apologies). After the bathtub pour, concrete began in late January, with the first steel connecting the parking...
  2. I

    Education First (Phase III) | 10 North Point Blvd | Cambridge

    Tower crane pieces onsite this morning: what you see was complete by 1800hrs. I apologize for the poor composition of the shot.
  3. I

    Parcel JK | Cambridge Crossing | Cambridge

    Re: Parcel JK | NorthPoint | Cambridge Lot JK cross beam steel is at Level 02, relative to street, or Level 05, relative to basement pour (and lower three levels assembly from a month ago):
  4. I

    The Hub on Causeway (née TD Garden Towers) | 80 Causeway Street | West End

    Excellent Nunberg reference, Shmessy!
  5. I

    The Alcott (née Garden Garage Towers) | 35 Lomasney Way | West End

    Re: Longfellow Place (née Garden Garage Towers) | 35 Lomasney Way | West End They were there pretty early this morning. They made the already snarled traffic in that area a mess - especially since some of the folks were about 5-7 feet into the street (on the garage side) and blocking one of...
  6. I

    Parcel JK | Cambridge Crossing | Cambridge

    Re: Parcel JK | NorthPoint | Cambridge This is the state of the north end of Philips' building on Divco's Lot JK: This is from a similar perspective, cropped:
  7. I

    Cambridge Infill and Small Developments

    Revealing that eye catching glass bouquet is going to make McDonald's so happy! ...a building with (potentially) modest character stuck on a terribly awkward lot...
  8. I

    AVA North Point II | Archtone phase II | East Cambridge

    Given the poor fitment of various panels, it certainly leaves something to be desired. Like hood/door gaps on a Plymouth Reliant. It's better than the empty lot (and the various messes that plagued it), though.
  9. I

    Education First (Phase III) | 10 North Point Blvd | Cambridge

    Pile driving has recently slowed. They were driving for more than four weeks: rain or shine!
  10. I

    Parcel JK | Cambridge Crossing | Cambridge

    Re: Parcel JK | NorthPoint | Cambridge Steel for parking decks -03 and -02 is moving quickly (filling at the same time); probably a week or two to see -01 and then street level steel. The core is almost complete. ——— SUPPLEMENTAL: Shadows obscured the site very well last night; steel is...
  11. I

    Parcel JK | Cambridge Crossing | Cambridge

    Re: Parcel JK | NorthPoint | Cambridge Launch pad 39B will accompany the existing pad at 39A ... whoops! The second tower crane is under construction. It's a little late, but should be finished by Friday, if we are able to use the first crane as a temporal guide. Note, as well, that the core...
  12. I

    AVA North Point II | Archtone phase II | East Cambridge

    Confirmed: people are living in AVA (south building) ... not many, but some rooms are decorated and folks are using the gym. The parking garage ingress/egress is literally barricaded, though (as of tonight): not sure what happened there - a few residents parked on the street.
  13. I

    Parcel JK | Cambridge Crossing | Cambridge

    Re: Parcel JK | NorthPoint | Cambridge Lot JK progress is continuous...Looking down on the core makes it look fairly short but it is rising from a base of three levels of parking to two stories above grade so far. ...and for some reason it's lit up at night like a wedding cake... I wanted...
  14. I

    AVA North Point II | Archtone phase II | East Cambridge

    I agree. I would have loved more edginess using some grey or black brick but the project presents better in person than expected (admittedly not from all angles). I’m not sure if there’s anyone there yet. Leases should have begun on some first and second floor units on 5 January. And on...
  15. I

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Yes, that’s a view of I Lot, looking south. That was released as part of the rebranding rollout. Big I will be the tower and Little I will be the amphitheater-esque mini park. We’re pleased that was locked (supposedly) as a condo building. DivCo told us that most of the planned residences...
  16. I

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Apologies...I was unclear. You’re correct, the render evolved to accommodate the removal of the ventilation system. The third render (before the name addition) was in the rebranded Cambridge Crossing material when the new website launched and also in what DivCo West used at our condo...
  17. I

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Yes, Stick: Philips' lease will be in one that is under construction. No new renders, though (save for the addition of the Philips name); those are the images that literally surround the site and have been online since the rebranding. I'll upload an image or two soon. These folks have been...
  18. I

    Four Seasons Tower @ CSC | 1 Dalton Street | Back Bay

    Yep - holy frak this is good stuff.
  19. I

    Encore Boston Harbor Casino | 1 Broadway | Everett

    Re: Wynn Everett Casino | Everett I wonder, too. I watched workers installing window frames in the coffee shop section of AVA Northpoint this morning while walking the dog. They kept dropping some of the metal pieces...
  20. I

    Cambridge Crossing (NorthPoint) | East Cambridge/Charlestown | Cambridge/Boston

    Correct; they built the base anchor several weeks ago and the tower crane's segments have been on site for over a month.

Back
Top