PAR would have to shove out towards 3rd Ave Crossing towards Swift (Fitchburg Route) or shove out towards Tower A on either ML 2,3, or 4 via the 645 crossover. Before I retired, there was talk of attempting to somehow construct a direct connection from Yard 10 (Innerbelt) to the mainline east...