Search results

  1. G

    Aloft & Element Phase 2 | 391 D Street | SBW

    can a mod change the title to: Aloft & Element Phase 2 | 391 D Street | South Boston Waterfront
  2. G

    Bill Russell Bridge | North Washington St.

    https://charlestownbridge.com/2025/02/20/north-washington-street-bridge-5/ Scheduled Work • West sidewalk concrete placements • Marine fender pile concrete fill • Lovejoy walkway pile cap concrete placements • FRP fascia screening installation
  3. G

    Bill Russell Bridge | North Washington St.

    https://beaconhilltimes.com/2025/01/09/north-washington-street-bridge-4/ • West sidewalk formwork and utility install • Southwest approach barrier and sidewalk work • Marine fender wood installation • Lovejoy walkway pile cap formwork
  4. G

    South Boston Innovation Campus | 4 Harbor Street | Seaport

    breaking out the second phase https://handelarchitects.com/project/4-harbor-life-sciences-center site: https://www.google.com/maps/@42.3460996,-71.0364281,168m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI1MDEwMS4wIKXMDSoASAFQAw%3D%3D...
  5. G

    Bill Russell Bridge | North Washington St.

    North Washington Street Bridge Construction Update The Construction Look-Ahead through January 4 for the North Washington Street Bridge is as follows: Scheduled Work • West sidewalk formwork and utility install • West pedestrian handrail installation • Southwest approach barrier and...
  6. G

    60-80 Cross Street | North End

    Is this the same site? North End Piazza on The Greenway | 198 Hanover Street | North End
  7. G

    401 Park Drive (née Landmark Center) | Fenway

    is there an entire separate building going in on the corner (based on what appears to be foundation work in IMG_7097)?
  8. G

    ISQ3 | 22 Drydock Avenue | Seaport

    nice shots, beeline! did you happen to see if the South Boston Innovation Campus parcel has a fully developed "park" and parking lot at this point?
  9. G

    🔹 What's Happening With Project X?

    and these? Housing on D Street | Massport Parcel D4 | Seaport Reserved Channel Development | 300 West First Street | South Boston Channelside (née P&G) | 244-248 A Street | Fort Point
  10. G

    🔹 What's Happening With Project X?

    updates? EB80 | 80 East Berkeley | South End Boutique Hotel at 88 North Washington St | Bulfinch Triangle | West End Cambria Hotel | 104 Canal Street | Bulfinch Triangle Oxford Office Bldg. | 125 Lincoln St | Leather District
  11. G

    🔹 What's Happening With Project X?

    i'd like to know the same. i'm guessing this design is contingent on this project finishing first: https://archboston.com/community/threads/north-station-charles-river-draw-tower-a.5333/page-12
  12. G

    Seaport Square (Formerly McCourt Seaport Parcels)

    perhaps it's a sign that focus may shift to the long overdue Parcel D? or easy to complete Parcel N?
  13. G

    One Harbor Shore Dr. | Fan Pier Parcel H | 1 Harbor Shore Drive | Seaport

    Back in the 20-teens, I wondered who'd win the race to fully develop their "neighborhood": Fan Pier, Boston Landing/New Balance Complex, or Assembly Row. Obviously Fan Pier is going to win out; Boston Landing/New Balance Complex still has the hotel parcel remaining and Assembly Row still has...
  14. G

    North Station Gateway | 251 Causeway St | Bulfinch Triangle

    I wish focus was less on rebuilding the "general area" which is already developed and more on filling in the 7 (as I count) surface parking lots throughout the rest of Bulfinch Triangle.
  15. G

    North Washington St. Bridge Lights

    mods, please merge this into: https://archboston.com/community/threads/north-washington-st-bridge.4504/page-35
  16. G

    Winthrop Center | 115 Winthrop Square | Financial District

    I just called the front desk and asked. They said the previous forms arrived cracked and they're in the process of redesign and are still deciding how the new column is going to look. No word on timing.
  17. G

    Ginkgo Bioworks (Parcels O&P) | 1-3 Anchor Way | Raymond L. Flynn Marine Park

    Maybe it'll follow the same pattern as Innovation Square - those power lines were finally undergrounded a year after completion https://archboston.com/community/threads/innovation-square-isq-6-tide-st-seaport.5581/page-7
  18. G

    Bulfinch Crossing | Congress Street Garage | West End

    oh my goodness that 3rd tower needs to be next in line
  19. G

    North Station, Charles River Draw, & Tower A

    nice! now only to finish the plans for the South Bank Bridge

Back
Top