Search results

  1. S

    ArchBoston Book Club (Book #1 - Abundance)

    I struggle on an answer for this that isn't along the lines of "just do it" regarding providing housing for the homeless to force an "ah, so it was about housing..." I realize this was my answer before for another question, so maybe I'm just growing impatient with the general status of things...
  2. S

    Old Port Square (née Canal Plaza) | Portland

    This took a few hours to grow on me... and now that I've heard the lighthouse comparison, I'm more of a fan. There's something still off about the top - the curves don't resemble New England/Maine much at all. I'd be interested to see iterations of different tops on this. I think it still needs...
  3. S

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    $100M our of 370M for training? I get that there's safety training that's required, but $100M/yr+ worth?
  4. S

    Copley Square Revamp | Back Bay

    These were done by an intern with a deadline of "the presentation is tomorrow, please stay late" and often require photoshopping and cropping out figures from pictures in stock photos or online images. They're done quick and cheap because nobody really pays attention to the people - they're just...
  5. S

    Grounding the McGrath

    Your own note above ^
  6. S

    Block G | 120 Seaport blvd | Seaport sq

    The application linked above still describes the project as a 16-story mixed-use building of approximately 650,000 square feet of Gross Floor Area of office and/or research, retail and civic uses within the cover letter.
  7. S

    ArchBoston Book Club (Book #1 - Abundance)

    (I read/listened ahead...which is book club rule #1 to not break (but I unfortunately now sit in quite a bit of traffic some days..). I don't really remember much of the specific details of the introduction, because the meat of the book does contain a lot more weeds and dryness. I will say I...
  8. S

    MBTA Construction Projects

    It almost seems like the project has been forgotten about... Last year's CIP showed a $1.9M programmed spend for FY25-29, this year's shows $0 for FY26-30, but nothing happened last year.
  9. S

    Dana-Farber Cancer Center | 1 Joslin Place | Longwood

    And not arguing that the curves on the rectilinear form is going to be difficult to pull off, but they don't have much say at all in the siting.
  10. S

    Dana-Farber Cancer Center | 1 Joslin Place | Longwood

    Something I appreciate about this and one thing Payette is consistent with is "hiding" the fact that these are complex buildings. The Ragon Institute is a lab building that does a pretty good job hiding it's a lab building. This is similarly trying to hide the massive AHUs, ERVs, and air intakes...
  11. S

    DCR Allston-Brighton Riverfront Parks and Parkways

    I think that will happen in some cases, but what I see by MIT is a very clear divide between walkers and runners on the dirt/stone dust path and bicycles on the paved path. There are some walkers in the paved path but not as many/it doesn't feel as crowded.
  12. S

    One Harbor Shore Dr. | Fan Pier Parcel H | 1 Harbor Shore Drive | Seaport

    The "SERIOUSLY." really helps sell it.
  13. S

    10 World Trade | BGI Office Tower (Massport Parcel A2) | Seaport

    Hm, I was bothered by the misalignment between the interior and exterior slats (maybe it's the glass creating an illusion), and the dark joints don't look excellent/could blend in better. But I do appreciate this approach.
  14. S

    DCR Allston-Brighton Riverfront Parks and Parkways

    The stub roadway is for a future community center parking lot
  15. S

    DCR Allston-Brighton Riverfront Parks and Parkways

    What is the actual process to hand off DCR's responsibility of their roads to MassDOT or City Municipalities? Not that they're much better, but have we really seen any good reason to have DCR manage some roadways?
  16. S

    Somerville Infill and Small Developments

    I'll put it in this thread for now, until more solid plans are established - the Winter Hill Community School is up for replacement, and it seems like they are likely combining efforts/schools and replacing or adding on the Brown School as well, as one new school. I've heard/read rumors that the...
  17. S

    ArchBoston Book Club (Book #1 - Abundance)

    (For those holding out on buying, I noticed today by chance there's an Audiobook version for free available on Spotify Premium)
  18. S

    Copley Square Revamp | Back Bay

    We need to procure a planner for a study, which will include 3 years of community engagement, and another year to develop the report. Then we need to scope out the project and include it in the new masterplan, and then once funded, we can procure a designer, and include a 3-year community...
  19. S

    Grounding the McGrath

    Definitely worth getting clarification - the "what if" render with the ADA ramp (not proposed) has a different looking fence. Maybe this is because of the pedestrian bridge, but maybe it's the intended fence: I can appreciate a 2-3 ft fence, but if this is the intent it definitely introduces...
  20. S

    Porter Square Infill and Small Developments

    I think the graffiti artists have done more work on this than the workers the past year or so.. (on the back/rail side)

Back
Top