Search results

  1. C

    Crazy Transit Pitches

    I mean that modern el design or whatever sure looks pretty, but everything else is crackpot city. $2 billion to replace the ENTIRE FUCKING T with these dinky little elevated trams? It's costing us more than that to build a light rail line on a pretty much existing ROW. Then there's the part...
  2. C

    Assembly Sq <-> Casino Footbridge

    yeah but how often will the bridge be moving? I'm not sure how long it would need to be open for, and how frequently it would open, but that's a huge downside if people are stuck waiting for a boat to come through. The added frequencies don't mean jack if Wynn can't reliably utilize them.
  3. C

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Re: North-South Rail Link Are those beer and transits 21+ ?
  4. C

    Green Line Reconfiguration

    In a post NSRL world how important is load spreading Green through things like Blue to Kenmore? Let's pretend that we get current GLX plans, then Blue-Red @ MGH, and finally the NSRL, then what's the T's next move? I'm thinking that signal priority, burying the B, and a Huntington Subway...
  5. C

    New and Expanded Highways

    What if you built a mega "tesla" that could like put those 4 people in with the people from a bunch of other "tesla"s all headed into the city into one compact unit, and then use that mega "tesla" running in some kind of separated ROW with other mega "teslas" to maximize efficiency. Maybe even...
  6. C

    Lynnport (Former GE Gear Plant) | Lynn

    Re: GE Gear Plant - Lynn For who exactly? The new developers are going to focus on the Lynnway, not the godforsaken brownfields you want to build a park on. Assuming GE stays put (as it should), then you would have a park only accessible by employees on their lunch break. This is NOT...
  7. C

    Crazy Transit Pitches

    Going to have to address the overcrowded NEC and SS instead of the Central Subway, plus I'm not sure the demand will be there once EMUs are covering 4/6 of these stops going to Riverside. Definitely a cool concept, but it misses out on the B line improvements which would likely coincide with the...
  8. C

    Lynnport (Former GE Gear Plant) | Lynn

    Re: GE Gear Plant - Lynn The line is only 6 miles long as it is, and there's no way the project costs more than a billion.Rapid transit isn't nearly the same thing as commuter rail, and considering the massive impact upon bus transfers and transportation on the North Shore, it's more than...
  9. C

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Re: North-South Rail Link :rolleyes: Getting the discussion back towards reality, assuming NSRL does get built then what time frame makes the most sense for it's construction based on the current equipment and SSX needs? Obviously the demand is there, and the project will be worth it, but at...
  10. C

    Green Line Extension to Medford & Union Sq

    1. Orange can't share trackage with CR or freight due to NRA crash standards, and new cars are needed ASAP and cannot be sent back to the drawing board for this. 2. I believe GLX was also studied as BLX, but the high costs didn't make sense for the expansion as ridership was predicted to be...
  11. C

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Re: North-South Rail Link This bolded part implies that neither of the commuter lines (Worcester or Rockport) are running through the link, and has the proverbial tourist using the link as a half assed shuttle between the two stations. What's much more likely is that they make one or no...
  12. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Re: Driven By Customer 'Service' Parte Dos While the danger of pricing out small businesses is an issue and could be considered a type of gentrification, you can't say with a straight face that someone who owns land in downtown Boston is a member of this group. Focus the land tax in key areas...
  13. C

    Crazy Transit Pitches

    Saw some people tweeting about how much it would cost to electrify the T, and was curious how much a roll out in preparation for NSRL would cost. Whereas a lot of other figures have been including things like Fitchburg and the Old Colony lines in their electrification plans, I only went for the...
  14. C

    MA Casino Developments

    How feasible would it be to extend the orange line back along the former ROW to Everett? I'm assuming that it's a pretty crazy transit pitch when Assembly could perform the same function with a gondola/people mover/canon, but maybe with some serious TOD it could be useful.
  15. C

    Reasonable Transit Pitches

    Nows the time for it too considering the whole thing is up for repair in 2017. Increased Beverly frequencies and decreased maint. costs will pretty much pay for themselves, seems like a no brainer.
  16. C

    Kendall Common ( née Volpe Redevelopment) | Kendall Sq | Cambridge

    Re: Volpe Transportation Center Development Cambridge It's crazy how disconnected the current facility feels from the rest of the really dense and growing neighborhood, glad to see they're taking advantage of the space. Also, my mom works right next door and a surprising chunk of the students...
  17. C

    Fairmount Line Upgrade

    Re: Fairmont Line Upgrade Is he planning on reworking the program at all, or is this just a straight cancellation of the DMU lines?
  18. C

    Seaport Idea

    Exactly, there needs to be more oversight on what gets built and what doesn't. The question is how do they quantify a "unique" building and support their development without outright designing the thing themselves.
  19. C

    Green Line Reconfiguration

    What do you mean by upgrading the Green Line itself? I'm not sure if you're referring to upgrading to HRT through the core or one of the Blue via Riverbank ideas, or something else entirely, but there is so much more value in expanding the Green Line than just spreading the load before it...
  20. C

    Commuter Rail Reconfiguration

    Re: Green Line eRconfiguration It's a lot easier to work with the smaller edge on the mini highs, a full length retractable platform could fail much easier and will take considerably longer to retract. Not sure how big of a problem it is, but you also would have to account for clearance issues...

Back
Top