  1. R

    Bulfinch Crossing | Congress Street Garage | West End

    Read the discuss up thread. Nothing is be replicated.
  2. R

    Bulfinch Crossing | Congress Street Garage | West End

    Hatching on right (of this pic) because it will be behind construction fencing so median can be removed. Hatching on left because trucks (going to tunnels) can't make right turn without slip lane. Can't remove the slip lane and make a wider radius for trucks because the pedestrian crossing is...
  3. R

    Bulfinch Crossing | Congress Street Garage | West End

    what is being constructed now is an interim condition that keeps the median, but it and the SB lanes will be behind construction fencing. This work will open NB vehicles and sidewalks on both sides. final condition hasnt been exactly determined, but it removes the median and isnt expected to...
  4. R

    North Washington St. Bridge Lights

    such a random thing to harp on about. the structure isnt even complete, but the lights arent on?? btw, can we get this thread merged already
  5. R

    State Street HQ | One Congress | Bulfinch Crossing | West End

    when I went by this AM work was being done on the curbs.
  6. R

    Gillette leaving Southie.

    the zoning is set by the 100 Acres Master Plan. Dont know/havent looked to see if they are exceeding open space (or if its set at 50% min required) or limiting FAR (or if its set at 4.3 max allowed).
  7. R

    North Washington St. Bridge Lights

    most of the work is being done under the bridge right now, finishing up the structure by Converse Construction Look-Ahead: August 18 through August 31 Scheduled Work Pier 1 West columns formwork, V-arm, and rebar Architectural trellis installation City Square sidewalk City Square utilities...
  8. R

    Bulfinch Crossing | Congress Street Garage | West End

    To get the thread back on track here they aren't building anything in the picture. That is the pedestrian protection to the T still up. On schedule for reopening as discussed above.
  9. R

    State Street HQ | One Congress | Bulfinch Crossing | West End

    the correct answer here: http://archboston.com/community/threads/bulfinch-crossing-congress-street-garage-west-end.2850/post-481901 along with sidewalks open as well.
  10. R

    BPDA Austin Street Parking Lot Development | Charlestown

    agree with the above except the tunnel is not going away, just getting narrower. at least it wasnt last time around, but then again there was going to be a tunnel at Sullivan and now there isnt going to be so not sure about here at Austin St.
  11. R

    Wentworth Mixed-Use Life Sciences Complex | 500 Huntington Ave | Fenway

    thanks for posting. this is IMP though, so probably better here: https://archboston.com/community/threads/wentworth-institute-of-technology-institutional-masterplan.7009/
  12. R

    Bunker Hill Housing Redevelopment | Charlestown

    thats not accurate at all, as shown by the flood maps. only a small portion of the BH site is even in the 2070 1% flood zone. not sure if its intentional for a narrative or ignorance but here it is, 2070. most of Charlestown is actually pretty well protected except the neck and the infill...
  13. R

    Bunker Hill Housing Redevelopment | Charlestown

    Sullivan area is much more suseptable to flooding than here. Look at the food maps. Not only that but it provides a way in for water to go far to the west.
  14. R

    49-51 D street | South Boston

    Article 80 Large project review supersedes zoning for parking.
  15. R

    Fort Point Infill and Small Developments

    for the southern end of Fort Point, this is the more current layout of roads and open space (also includes 15 Necco and Channelside 3 buildings) https://www.sasaki.com/wp-content/uploads/2022/02/Plan_with-text-labels_website-1800x1391.jpg
  16. R

    Bill Russell Bridge | North Washington St.

    design flaw of what, the dam from 45 years ago?
  17. R

    11-21 Bromfield Street | DTX | Downtown

    Correct, and that all went down under prior administrations, city and state.
  18. R

    Midwood Development Proposed 23-story office tower at the corner of Bromfield and Washington streets

    but the 'zoning' process for this would be Article 80 Large Project Review (as with anything over 50KSF). there arent parking minimums on any of the land uses. zoning doesnt have a say in parking for these projects. there are maximums in place, not minimums, and there has been for over 20...
  19. R

    MBTA Buses & Infrastructure

    https://www.mbta.com/projects/silver-line-extension-slx-alternatives-analysis