Search results

  1. R

    WBZ-TV/CBS Studio Development Project | 1170-2000 Soldiers Field Road | Allston

    what is the address/location of the EEI tower site that also sold? there will be a thread for 83 leo before end of spring...
  2. R

    Bill Russell Bridge | North Washington St.

    The bike lane is not outboard of the sidewalk. How are you getting that (especially from a picture that is structure only)? It's already half built on the Charlestown side between the road and sidewalk. there wasn't enough room on the N End side to finish it with temp bridge in place...
  3. R

    Bill Russell Bridge | North Washington St.

    the picture is of the east side, poster wasnt referring to the temporary bridge.
  4. R

    Franklin Park - White Stadium Renovation

    It would be in the recordings from the recent BPDA meetings. Otherwise look here https://www.boston.gov/education/white-stadium#faq Then click on transportation
  5. R

    Franklin Park - White Stadium Renovation

    its #1. the article is 5 months old, there have been multiple meetings since then where they have committed to it for game days. didnt mean to make you feel called out, was just trying to keep information current. you are definitely correct that they were noncommittal during the fall meetings...
  6. R

    Franklin Park - White Stadium Renovation

    this x1000. I golf there on weekends and there is always music blasting from different areas of the park that carry sound through the park. its a unique golf experience thats for sure and adds to the experience in my opinion. this is not correct. the City has committed to having the team...
  7. R

    Seaport Transportation

    The T12 of BNRD is serving this. Direct connection from Andrew to Seaport along a D St bus corridor without the circuitous route.
  8. R

    Franklin Park - White Stadium Renovation

    only most of the residents that speak at these meetings do not like the BRT lanes.
  9. R

    State Street HQ | One Congress | Bulfinch Crossing | West End

    I wasn't commenting on what was next, I was discussing why the east parcel plan was originally 3 buildings but is now only 1. The residential building is on the west parcel.
  10. R

    State Street HQ | One Congress | Bulfinch Crossing | West End

    thats why there is only 1 building in the plan now. 'near' the tunnels, not on them or supports through the stations as the previous 3 building iteration would have required.
  11. R

    Exchange South End ( Boston Flower Exchange) | Albany Street | South End

    The IAG reviewed the coop agreement awhile back. Nothing changed since then and it was then executed. Some on the IAG need to understand the A in the acronym. They advise, not decide. Not liking the agreement is not the same as not reviewing the agreement. There were never 'ramps'. The...
  12. R

    Post-Covid Travel Patterns and Solutions

    the xpressway is the extra 25 to 45 minutes?
  13. R

    Post-Covid Travel Patterns and Solutions

    Is it consistently specific areas causing the extra time?
  14. R

    Post-Covid Travel Patterns and Solutions

    in 2019 they were replacing the viaduct in Chelsea I believe. Either way, you have to be careful using daily traffic volumes and equating that to 'traffic is worse'. adding volumes at off peak times will give you higher ADT, it doesnt make traffic worse, necessarily.
  15. R

    Post-Covid Travel Patterns and Solutions

    you'll have to start by 'proving' this. From actual traffic count data volume, peak hours are near where they were but it then tails off much more rapidly than pre covid (ie, a 4 hour count volume is less now than it was before). also count wise, the PM peak hour occurs earlier now that it...
  16. R

    New England Revolution Stadium | 173 Alford Street | Boston-Everett

    it means the residents of new developments wont be eligible to receive RPP stickers.
  17. R

    On The Dot | 505 Dorchester Avenue | South Boston

    its also presuming the city wanted/would allow bigger footprints, which is not the case. thats not how it works though. there arent residential units on the ground floor and all of these buildings have set backs above the podium. the number of residential units arent impacted by the parking...
  18. R

    On The Dot | 505 Dorchester Avenue | South Boston

    Sidewalks are wider. Cafe zones are included in addition to that. Complete streets doesn't mean ignoring cars, whether we want it to or not. Don't assume it's parking. Curb use is needed unless you want the activity occuring in the travel lane. Also don't assume the bike lane isn't straight...
  19. R

    On The Dot | 505 Dorchester Avenue | South Boston

    'they' is the City. its from the PLAN Dot Ave study and yes for the reasons you mentioned. It is not under the control of the On The Dot project though since the realignment is on the east side of Dot Ave.
  20. R

    On The Dot | 505 Dorchester Avenue | South Boston

    its all the same development. title of the thread is misleading. BPDA has it listed as 475-511. Phase 1 of the master plan are the 4 buildings here: the entire PDA site plan:

Back
Top