Search results

  1. R

    Seaport Neighborhood - Infill and Discussion

    this image has an old version of Ft Point 100 Acres plan that includes Summer St edge https://1.bp.blogspot.com/-XJHREyj_xT4/Xk1YZcPQPtI/AAAAAAAACFo/3hKAp47ZA2szW-9PUmxJpRAeF0lPgcu6gCLcBGAsYHQ/s1600/100%2BAcres%2B4th%2BAmendment%2BOpen%2BSpace%2BDiagram.png this is the newer version of 100...
  2. R

    Seaport Neighborhood - Infill and Discussion

    and owned by USPS.... that is coming.
  3. R

    Hood Business Park | 480-570 Rutherford Avenue | Charlestown

    designed and constructed to be able to take out every other level of the garage and convert to occupiable floors
  4. R

    Bill Russell Bridge | North Washington St.

    Slides are here. https://www.mass.gov/doc/north-washington-street-bridge-public-information-presentation-111423/download Switch happening between now and Christmas, which is the schedule that was given last October, so that's good to see. Must have been an efficient meeting. I showed up just...
  5. R

    Hood Business Park | 480-570 Rutherford Avenue | Charlestown

    all the garages? there is only one and it was built that it could be converted into a building should parking demand go away in the future. You should see the PDA from 2001. Legit suburban office park with 2 above ground garages along Rutherford where the Harvey is now and Hood Green is planned.
  6. R

    Bill Russell Bridge | North Washington St.

    Pavement markings are down. 1 lane outbound, 2 lanes inbound.
  7. R

    Bill Russell Bridge | North Washington St.

    There are meetings this week for updates. Sidewalk looks pretty close to opening, which is on pace with Oct 2022 timelines. Project complete includes removing the temporary bridge. That was never the opening date.
  8. R

    Bulfinch Triangle rezoning

    most everything in this picture supports the station. vents and emergency egress on the left, staircase just inside the building on the right. no way for store frontage here. the buildings also needs loading unless you want it occurring in the streets as happens for all the older buildings...
  9. R

    Bowker Overpass replacement?

    So you want more cars in the area?
  10. R

    420 Rutherford Avenue | Charlestown

    420 was built as of right based on the old (as of Wednesday) zoning. This is what we would have gotten everywhere west of Rutherford without PLAN Charlestown. No open space, limited ground floor activation.
  11. R

    Green Line Extension to Medford & Union Sq

    Staying on schedule is now 'pushing'? You really think the way this went was that 'upper management' found out and told the transportation secretary and the governor and were told to stand down? You think 'upper management' are people that you've heard of before? These decisions were made by...
  12. R

    One Mystic | 1 Mystic Avenue | Charlestown

    the last bullet in the screen cap in the post above yours states its 800' shorter than existing. How is that 'staying as is'? they are doing exactly what you suggest. the existing under pass currently goes beyond Essex St. As of 2 years ago, the future tunnel will be back to grade prior to...
  13. R

    One Mystic | 1 Mystic Avenue | Charlestown

    not for somebody that clearly just loves to troll, but for the rest of you
  14. R

    One Mystic | 1 Mystic Avenue | Charlestown

    you see the stop bars next to the crosswalks?
  15. R

    One Mystic | 1 Mystic Avenue | Charlestown

    nitpicking a bit here, but again, its not the BPDA plan for circulation. They work with, but are ultimately given the future design by BTD/MassDOT. they are aware of what the future plans/capacity are at this time even if the public isnt. does Huntington Ave and Comm Ave underpasses at Mass...
  16. R

    One Mystic | 1 Mystic Avenue | Charlestown

    Nope sorry. That's 8 highway lanes becoming 8 urban lanes. Much more narrow. And the reason the lanes aren't being reduced is because there will be signals at each end for pedestrian crossings. Where as now, it's free flow highway. And yes I realize that there is a lane closed in the tunnel...
  17. R

    One Mystic | 1 Mystic Avenue | Charlestown

    2 years old but.... Not only not more lanes, but lanes designee to urban standards so a greater reduction in feet than just lanes. https://www.boston.gov/sites/default/files/file/2021/09/june-2021-revised-plan.pdf And the reasoning for the updated design that still hasn't been released...
  18. R

    One Mystic | 1 Mystic Avenue | Charlestown

    PLAN Charlestown is by the BPDA. They don't design roadways. Sullivan/Rutherford is being designed by MassDOT and BTD. Though I'm sure BPDA has a more up to date idea of what is being designed now than what the public saw in 2021. But it's an important distinction, it's not the PLAN...
  19. R

    One Mystic | 1 Mystic Avenue | Charlestown

    particularly, peak period traffic congestion that is not caused by area residents, but regional commuters and highway access. This is definitely the case in Sullivan Sq. Never going to win the congestion battle regardless of the uses around it.
  20. R

    Bill Russell Bridge | North Washington St.

    Not a great pic because the view from the temp ped/car bridge is blocked by the view of the temp utility bridge, but street lights and trellis are going up.

Back
Top