Search results

  1. TheRatmeister

    Metro photos from around the world

    Hoek van Holland Strand (Rotterdam Metro) Possibly the only metro system with easier access to the beach than the T.
  2. TheRatmeister

    Crazy Transit Pitches

    We have a data point against this, and it's parking utilization at Riverside. It's crap, and has (AFAIK) never come close to filling up, even pre-COVID. It was at around 38% utilization at peak periods. Maybe with fast and more frequent than today regional rail service it would be more...
  3. TheRatmeister

    Metro photos from around the world

    Parkweg (Rotterdam Metro)
  4. TheRatmeister

    Morrissey Boulevard Redesign

    I'm not sure about that. In my opinion either the median needs to be wide enough that people actually want to be there (I would argue 10' is not nearly wide enough for that), or you keep the median small and use it to add some tree cover.
  5. TheRatmeister

    Crazy Transit Pitches

    With more maintenance and/or looser safety standards.
  6. TheRatmeister

    MBTA Construction Projects

    I have seen a leaked draft schedule for the Worcester Line with all day 30 minute frequencies to Framingham. Obviously that doesn't make it guaranteed but it's absolutely being planned.
  7. TheRatmeister

    Where am I? The photo contest

    I could immediately tell it was Alewife from the first picture but finding where took far too long.
  8. TheRatmeister

    The Official MBTA System Map

    Maybe as part of the Fairmount Line service cuts it would make sense to add a little insert like so?
  9. TheRatmeister

    Tobin Bridge Relocation/Replacement

    For the GJ itself It would maybe help a little but not that much, and as F-Line said the entirely different system probably outweighs any benefits. The better solution (IMO) is to do an elevated viaduct for grade separations. The Grand Junction thread has more discussion about that but the TLDR...
  10. TheRatmeister

    Tobin Bridge Relocation/Replacement

    So let's compare with some actual subway stations, plus a couple others on Rt 1. Station Walkshed Population 2019 Weekday Boardings (If applicable) Estimated Riderhship Bellingham Sq 20.7k ~13.5k (Based on Davis) Prattville 14.6k ~5k (Based on Revere Beach, some bus transfers added.)...
  11. TheRatmeister

    Tobin Bridge Relocation/Replacement

    The stations at Revere Center and Woodlawn are both fairly compelling IMO, and Woodlawn is probably cost-effective because of point 2: Along Route 1, both Prattville and Woodlawn are very well situated for bus transfers and integration using the BERy Model. (I like that name better and it's way...
  12. TheRatmeister

    Tobin Bridge Relocation/Replacement

    You would be correct. There's also the fact that GL/OL/RL rolling stock isn't the only thing available. (From my understanding) just about any subway car could be juiced up to handle higher gradients. Obviously this is usually more expensive than just, not having higher gradients, but that's...
  13. TheRatmeister

    Tobin Bridge Relocation/Replacement

    Height, sure. Straddling? Probably not. The slim supports of modern concrete viaducts could easily fit in the ~15' of shoulder space on Rt 1. Agreed. Everett is the clear winner of the 3 options. However, it's still worth keeping in mind that routing an Everett subway via the Tobin only really...
  14. TheRatmeister

    Tobin Bridge Relocation/Replacement

    How feasible is the Rt 1 alignment? From South to North, what might a subway line along Rt 1 look like? Map The basics: The line would run from Charlestown (continuing on to... somewhere) to either Woodlawn (around Park Ave) or Northgate (Squire Rd). Stations: Constitution, Admirals Hill...
  15. TheRatmeister

    Tobin Bridge Relocation/Replacement

    I really see no reason to handicap such a line by using the Brattle loop. You could run elevated rail over Rt 1 for most of the same effect, then head over N. Washington St for a surface or elevated terminus next to Haymarket. That could at least be high-floor light rail or even full subway...
  16. TheRatmeister

    Tobin Bridge Relocation/Replacement

    Any bridge replacement is probably far enough out that we could speculate 6-8 minute headways on the branches but the point doesn't really change. Both branches need better.
  17. TheRatmeister

    Tobin Bridge Relocation/Replacement

    Here's a map with basically any alt. I could either find or think of. I'd almost certainly lean towards heavy rail, it has options that span across the possible cost spectrum.
  18. TheRatmeister

    Tobin Bridge Relocation/Replacement

    Isn't there some debate about how high the new bridge should actually be?
  19. TheRatmeister

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    They're fare machines, I'm not sure what you expected. Here are some from London and Paris: In terms of functionality they look pretty good. The side buttons are better than touch screens IMO and everything is labeled clearly.
  20. TheRatmeister

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Is it being cut or is the scheduled service being changed to reflect what the actual service already is? If you add up the new frequencies they're damn close to the 28TPH Park St is seeing currently.

Back
Top