    Also, EMU service with full highs could reduce travel time to induce more commuters to move southward
  3. T

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    And how many drawbridges are there on NEC? And not all the 35 bridges are centered and undercut. Many of the Springfield area bridges are higher. I have the data somewhere, but would need to find it
  4. T

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    It might technically be Charlton there. The track and like are 500ft apart. Just west of Rochdale.
  5. T

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    Spencer where the track drops to just above the pike and somewhere in the western part of Worcester
  6. T

    I-90 Interchange Improvement Project & West Station | Allston

    The bad planning is provision for 50+ layover spaces.
  7. T

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    I would expect 3-4 stops between Springfield and Worcester at the most, so EMU acceleration wouldn't make as much difference, really just " curve recovery".
  8. T

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    And yet every day, numerous electric trains "coast" across several drawbridges without electrification.
  9. T

    Crazy Transit Pitches

    You are correct about MainSt, but an LRT system could be grade separated at Broadway and Binney
  10. T

    MBTA Red Line / Blue Line Connector

    Wht would you necessarily need new elevators and escalators? If much/most traffic is transferring to RL, there might not be that many more people using them to exceed present capacity
  11. T

    MBTA Red Line / Blue Line Connector

    The portal was filled in, but should be relatively easy to dig out, and the street is sloping down as the track would be going up, the impact should be much less than cut and cover. The platforms would be at the same height and access would be by existing RL infrastructure
  12. T

    Green Line Reconfiguration

    I still like Ari's idea of a viaduct out of the exstant portal even if it means turning every other train at Bowdoin due to a single tail track. 250M tops and a lot less disruptive
  13. T

    I-90 Interchange Improvement Project & West Station | Allston

    This will add at least 250M to the project
  14. T

    Regional New England Rail (Amtrak & State DOT & NEC)

    Does anyone have access to any diagram of Amtrak's planned Southampton Yard upgrades?
  15. T

    Crazy Highway Pitches

    I think that high speed light rail is the future on that line. Getting affordable heavy rail out past Arlington heights will be rough
  16. T

    Regional New England Rail (Amtrak & State DOT & NEC)

    All MassDOT studies are preordained.
  17. T

    I-90 Interchange Improvement Project & West Station | Allston

    The T is only planning for 5tph, including Amtrak. Transitmatters calls for 4tph peak and 2tph off from Worcester and an additional 4tph from Framingham. Three possible stop patterns. 8-9tph is not that busy. 9 tph is about 7 minutes per.