Search results

  1. B

    Green Line Extension to Medford & Union Sq

    They’re jackhammering the brand new path?
  2. B

    I-90 Interchange Improvement Project & West Station | Allston

    Yes, the opportunity cost of the development not taking place is much greater than the sunk cost of the repairs. However, it is disappointing MassDOT has a trend of prolonging the planning phase which makes repairs necessary. This is exactly what is happening with McGrath Highway now. Millions...
  3. B

    General Infrastructure

    Slow zones spreading to the harbor now too. Need some weekend closures for water work.
  4. B

    General Infrastructure

    Can a town do that? It seems akin to a town closing a highway that runs through it.
  5. B

    Green Line Extension to Medford & Union Sq

    The new excuse is that they need custom ties, estimated to be fixed “Spring 2023” https://mass.streetsblog.org/2023/01/18/temporary-green-line-slow-zone-approaches-1-year-anniversary/
  6. B

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Which leads me to the question: is that a limit imposed because of the track quality, vehicle design, signaling system, or something else? Probably a poor comparison but I never understood why high speed rail can go 160+ over a switch but the Green Line has to go so slow.
  7. B

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I feel like this 10mph limit over switches was already in place for the Green Line. At least on the GLX it has always slowed significantly over every switch regardless of if it is changing track.
  8. B

    Commuter Rail to New Hampshire?

    You are failing to recognize that rail benefits the people who don’t use it. The mode shift of people in the catchment area of rail frees up space on the road for those who live further North. Adequate rail service negates the need for highway expansion. Highway expansion will inevitably induce...
  9. B

    Green Line Extension to Medford & Union Sq

    My unrealistic optimism tells me there’s a chance he’s leaving the MBTA to be Healey’s Transportation Secretary… but I know that’s not true. We really cannot afford to lose what little talent we have at the MBTA.
  10. B

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Way more cost for a tunnel which leaves out 4/6 Northside lines
  11. B

    DCR Allston-Brighton Riverfront Parks and Parkways

    Yes, which is why a road diet is planned here. Adding a median to the design is counterproductive when the goal is traffic calming.
  12. B

    DCR Allston-Brighton Riverfront Parks and Parkways

    The point is that this should not be considered a major road, it’s a park. “medians… can increase traffic speeds by decreasing the perceived friction through separating traffic flow directions” - https://safety.fhwa.dot.gov/saferjourney1/library/countermeasures/16.htm
  13. B

    DCR Allston-Brighton Riverfront Parks and Parkways

    Median separation will only serve to increase vehicle speeds and reduce functional green space.
  14. B

    Crazy Transit Pitches

    Converting Sullivan Square underpass to BRT-ROW Something I have thought of, I’m not sure if it has already been discussed. I think this is borderline reasonable with the current SL extension and Sullivan Sq. Redesign plans. Why not use the Sullivan Square underpass as a BRT ROW? It could be...
  15. B

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    NTSB Report reveals Green Line TPS Project delayed from “late 2023” to June 2025. What happened to the tens of millions from the operating budget that were redirected to accelerate this project?
  16. B

    MBTA Construction Projects

    Wasn’t there a recently failed proposal from a private operator for passenger traffic on the P&W? Did they have a plan to deal with these issues or was it just ignored. I know the proposal was shady at best, but I can’t imagine any investor believing they could fund the installation of signals...
  17. B

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Assuming all North Point parcels get developed, does anyone know what the next best portal / staging sites are?
  18. B

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Healey and Driscoll retain Krauthamer & Associates to find MBTA’s next general manager Governor-elect Maura Healey and Lieutenant Governor-elect Kim Driscoll retained Krauthamer & Associates, an executive search firm, to find the MBTA’s next permanent general manager following Steve Poftak’s...
  19. B

    Green Line Extension to Medford & Union Sq

    Is it possible that they are training for how they would respond to a station emergency?
  20. B

    Green Line Extension to Medford & Union Sq

    I’ve tried to ask this here and on twitter but have never really gotten an answer, is there a plan for eliminating stop signs on the Green Line? Will the new signal system implemented with Green Line Transformation remove them? I know some GLX stations have at-grade ped crossings, but there are...

Back