Search results

  1. cubbe8

    Biking in Boston

    There are some gaps along the corridor as space doesn’t allow with the bus platforms.
  2. cubbe8

    Bill Russell Bridge | North Washington St.

    It’s not done, they will be added later
  3. cubbe8

    Green Line Type 10 Procurement

    These signs were on display which show alerts and express information.
  4. cubbe8

    Green Line Type 10 Procurement

    Eng was there, I talked to him and he said the only way to allow a wider passage is to change the seating to forward backward seating but that would loose 6 seats.
  5. cubbe8

    Green Line Type 10 Procurement

    Maybe this is a minority opinion but I feel like the design of the type 10s fit in with the Green Line quite well.
  6. cubbe8

    Transit via the Grand Junction Corridor | Cambridge and Boston

    Maybe something similar to the River Line in Trenton?
  7. cubbe8

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    https://www.mbta.com/news/2024-10-17/november-service-changes-mbta-continues-repair-work-improve-reliability-across-the?utm_term=orange-line&utm_campaign=curated-content&utm_content=November+Service+Changes%3A+MBTA+Continues+Repair+Work+to+Improve+Reliability+Across+the+System&utm_medium=news&utm...
  8. cubbe8

    Biking in Boston

    This is a temporary measure due to the work on eastbound. https://www.mass.gov/doc/dcr-memorial-dr-at-bu-bridge-traffic-management-plan-tmp-october-2024/download
  9. cubbe8

    Fenway Center (One Kenmore) | Turnpike Parcel 7, Beacon Street | Fenway

    Will a full wall be constructed between the station and I-90 or will there only be pillars?
  10. cubbe8

    I-90 Interchange Improvement Project & West Station | Allston

    Why not put it in the median of I-95?
  11. cubbe8

    The Official MBTA System Map

    Also the accessible icons are missing from the rest of the D branch stations, they will be complete by the time phase 1 is complete.
  12. cubbe8

    Biking in Boston

    This is a complete waste. They’re just raising the bike lane and removing the buffer. Not even fixing the broken concrete by the boathouse where the cyclist was killed. This is worse than adding concrete curbs to the existing buffered bike lane.
  13. cubbe8

    Green Line Extension to Medford & Union Sq

    Already discussed in the General MBTA thread.
  14. cubbe8

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    https://x.com/MBTA/status/1841311618765848912 Service to be suspended until start of service on Thursday.
  15. cubbe8

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Looks like there’s quite a bit of damage to the infrastructure. I would expect service to remain suspended for a while.
  16. cubbe8

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Train has derailed at Lechmere… https://x.com/MBTA/status/1841221579700613261
  17. cubbe8

    Biking in Boston

    I would assume the buffered bike lane would be removed and space allocated for the shared use path.
  18. cubbe8

    Biking in Boston

    I think they mean 12’ wide. How on earth do they already have the design in one week and the funding?? EDIT: Crimson reporting it’s a 12’ wide path the entire length from the boathouse to the bridge https://www.thecrimson.com/article/2024/10/1/cambridge-bike-safety-policy-order/

Back
Top