Considering signal crossings at Everett Ave, Spruce Street, and Arlington Street, were not included in Phase I initially, but apart of Phase II. This was one of the things that was moved.
Was it worth it? As a daily 111 rider I can say that... absolutely, it was worth it, as the signals will...