Search results

  1. T

    Crazy Transit Pitches

    You are correct about MainSt, but an LRT system could be grade separated at Broadway and Binney
  2. T

    MBTA Red Line / Blue Line Connector

    Wht would you necessarily need new elevators and escalators? If much/most traffic is transferring to RL, there might not be that many more people using them to exceed present capacity
  3. T

    MBTA Red Line / Blue Line Connector

    The portal was filled in, but should be relatively easy to dig out, and the street is sloping down as the track would be going up, the impact should be much less than cut and cover. The platforms would be at the same height and access would be by existing RL infrastructure
  4. T

    Green Line Reconfiguration

    I still like Ari's idea of a viaduct out of the exstant portal even if it means turning every other train at Bowdoin due to a single tail track. 250M tops and a lot less disruptive
  5. T

    I-90 Interchange Improvement Project & West Station | Allston

    This will add at least 250M to the project
  6. T

    Regional New England Rail (Amtrak & State DOT & NEC)

    Does anyone have access to any diagram of Amtrak's planned Southampton Yard upgrades?
  7. T

    Crazy Highway Pitches

    I think that high speed light rail is the future on that line. Getting affordable heavy rail out past Arlington heights will be rough
  8. T

    Regional New England Rail (Amtrak & State DOT & NEC)

    All MassDOT studies are preordained.
  9. T

    I-90 Interchange Improvement Project & West Station | Allston

    The T is only planning for 5tph, including Amtrak. Transitmatters calls for 4tph peak and 2tph off from Worcester and an additional 4tph from Framingham. Three possible stop patterns. 8-9tph is not that busy. 9 tph is about 7 minutes per.
  10. T

    I-90 Interchange Improvement Project & West Station | Allston

    RR Expresses should be stopping at Allston anyway. One of the major points of the stop is to detangle downtown by diverting pax to Harvard and Kendall.
  11. T

    I-90 Interchange Improvement Project & West Station | Allston

    Express tracks are unnecessary for what, one possibly, two tph?Amtrak trains blast through numerous stations on the NEC every day. West station should be no different. Especially when politicians get their heads out of their posteriors and realize that LRT is the only solution for GJ
  12. T

    I-90 Interchange Improvement Project & West Station | Allston

    NSRL means only replacing/referring one draw, not the three planned. A much cheaper option
  13. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    They will have no value in an electrified world.
  14. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    The T is telling Central and Western MA politicians that W/E can't happen without SSX. This year.
  15. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    And 600M is a lot for redundancy
  16. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    While I agree that that SSX is not necessary, RR expects that trains are MOVING, not sitting at Widett. But that doesn't mean that the T won't keep pushing ahead. Look at the new contract for Kcars. The T will keep wasting money on diesel, and then whine that they don't have the money to...
  17. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Also, W/E is nearly all funded. Another 50M to decrease single track sections should do the job(except of course, electrification)

Back
Top