Search results

  1. C

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    I have to ask, why does the T/Keolis do this consistent Spring/Summer and Fall/Winter schedule system, vs. just putting out new schedules when changes happen? Obviously this is a bigger schedule change with SCR and trains being renumbered, but most of the time no actual changes happen. Sorry if...
  2. C

    Fall River/New Bedford Commuter Rail (South Coast Rail)

    I was looking through the 1995 proposal for SCR, with one of the alternatives being a short extension from Stoughton to North Easton (which would probably be Easton Village, under current plans). How feasible would this be as a new “Phase 2”, pushing the full build to “Phase 3”? Seems to me it...
  3. C

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Was looking through Wikipedia trying to find ridership info, and noticed proposed South Salem had its own page now. Says the design was supposed to be done last month. Whats the current status on that?
  4. C

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    I can’t find the exact cost, but the 1994 PMT listed the Newburyport extension at 42.8M, 93.4M today (somehow).
  5. C

    Regional New England Rail (Amtrak & State DOT & NEC)

    I’m asking a lot here, but I have many questions. First off, if this is better for a new thread in the NH/Vermont section, let me know. Next, what is the best way to serve Portsmouth, upgrading the tracks connecting to the Downeaster and making a branch, or restoring the Newburyport line...
  6. C

    Crazy Transit Pitches

    The tracks to Newburyport are unfortunately long gone, but by what I see, you could run a Fitchburg-Lowell-Haverhill service.
  7. C

    Crazy Transit Pitches

    Going back to an extension to Millis, could a double tracked Franklin line even carry Franklin, Foxboro and Walpole services in a RR setting?
  8. C

    Green Line Reconfiguration

    Well disappointing, but thanks for sharing about that.
  9. C

    Green Line Reconfiguration

    Is there any documents about this line, or is it one of those were we have to rely on the newspaper?
  10. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I have no real guess, but my only idea is the T hasn’t updated departure times for each train to account for the end of slow zones.
  11. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Will there be shelters? That’s the only rendering I’ve seen for the new stations. Seems stupid not to install them.
  12. C

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Just a question for future stations/equipment. If we installed automatic “platform extenders” on coaches, would it allow full high level platforms on lines that can’t have them due to freight clearances?
  13. C

    Green Line Type 10 Procurement

    I don’t want to jinx it, but the type 9 delivery went fine, I trust CAF for the type 10 delivery to go well.
  14. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Thank you to the both you!
  15. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I don’t know if this is the best place to ask, but I didn’t want to start a new thread for it. Does anyone know if the 1978 PMT has been digitized or where I could find it in a library? The BPL site didn’t have it listed in their catalog, and I’m trying to find former T expansion plans. The 1974...
  16. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Definitely good, but ”rebranding” even as simple as one word would be expansive with the size of the CR system. Depending on how common (I don’t really know) key bus routes and communities are used, those could more easily be changed.
  17. C

    Crazy Transit Pitches

    On the topic of the route location, would running it via Chelsea be faster to getting to a new central station than the blue line to aquarium + a people mover or BL branch?
  18. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Would 60’ cars even be possible even with the loop closed? I feel like we should model them after Paris. Make them slightly longer and add another set of doors.
  19. C

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    From my 5 minute search, except until it went to a 2d map, I think continuous electrification should be possible on at least half of the line, and I’m sure a proper BEMU should be able to handle the remainder of the route.
  20. C

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I know it couldn’t be used as a test due to boarding heights, would would a BR class 745/755/756 (which is technically a FLIRT) adjusted for east coast standards (higher loading gauge, wider) work?

Back
Top