Search results

  1. C

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    I don’t know much, but the B branch to ruggles section would probably be sped up the most.
  2. C

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Would a modified Stadler KISS with doors at the mid-level sections be a viable EMU to run? I’m not really caught up on why caltrain’s were so bad.
  3. C

    Blue Line extension to Lynn

    So does this basically kill any Danvers CR line?
  4. C

    MBTA Red Line / Blue Line Connector

    I think inside 128 should all be $2.40 with inside 495 should be no more than $7.50. Unfortunately that would not be very profitable.
  5. C

    Green Line Extension to Medford & Union Sq

    It probably will have within a year or two
  6. C

    MBTA Red Line / Blue Line Connector

    Still a decent amount, short term may not be enough riders.
  7. C

    MBTA Red Line / Blue Line Connector

    Going through Point of Pines would serve more people though.
  8. C

    Green Line extension Newton to Needham

    I don’t think it’s been officially proposed in 20 years. It’s more concepts people have.
  9. C

    Green Line extension Newton to Needham

    It probably wouldn’t be very high as the loss of a direct South Station connection for Needham residents would be unpopular, even if it ends up being better for most commuters.
  10. C

    Green Line Type 10 Procurement

    It will probably be almost all longitudinal seating with accessible zones at most doors. However, I doubt we will see inside renderings for at least a year or two knowing the T.

Back
Top