Search results

  1. R

    Great Scott Redevelopment | 1 Harvard Ave | Allston

    They are showing past performers that played at the original location to show the importance of bringing it back. Same with passion pit and Phoebe bridgers.
  2. R

    The Ipswich | 2 Charlesgate West | Fenway

    https://www.scape.com/en-global/about-scape
  3. R

    General Infrastructure

    another option to the Single Point Urban Interchange (shown above) is to do a diverting diamond interchange. its basically an SPUI but with the Columbia Rd approaches flipped so that all of the left turns (EB to NB on ramp, SB off ramp to EB, NB off ramp to WB, and WB to SB on ramp) dont have...
  4. R

    75 Morrissey Boulevard | Dorchester

    75 Morrissey (TV studio building) are Bldgs A and B. This is a change of 1 lab building into residential. the existing office building is 55 (C and D) the Star Market is 45 (E, F, G and Park)
  5. R

    Bill Russell Bridge | North Washington St.

    I think the confusion comes from your use of 'its' and it only being at the arch. which could be taken to me the 'architectural screening' or fascia, which has been the general topic of this discussion.
  6. R

    49-51 D street | South Boston

    they were against the zero parking. they are typically pro development in this area. the realignment is from the PLAN Dot Ave study. this development is not implementing it.
  7. R

    Bill Russell Bridge | North Washington St.

    the architectural work that doesnt impact operations being done last? would seem to make sense
  8. R

    Hood Business Park | 480-570 Rutherford Avenue | Charlestown

    more activation: https://www.bostonswickedhauntfest.com/ winter market is planned for next
  9. R

    State Street HQ | One Congress | Bulfinch Crossing | West End

    thats not accurate. granted it wasnt as good, but it wasnt 'removed'. and it wasnt just the building that diminished the connection as the site plans evolved, there are other factors too. the image above has 2 buildings constructed on top of the T stations, which just isnt feasible at this...
  10. R

    Biking in Boston

    The intent of those electronic RTOR signs is to allow a right during a left turn overlap (so say allow NB and SB rights when EB and WB have protected lefts). There arent peds going during this phase in any direction. The sign is then illuminated when EB/WB (using example above) has the green...
  11. R

    Seaport Transportation

    not part, that is THE intention. get people to have a different/better option than red line/silver line to access Seaport. also, the intention of the T7 is to connect Sullivan (and points north) to the Seaport. extending that route even further to Andrew would be a negative for those riders.
  12. R

    Bulfinch Crossing | Congress Street Garage | West End

    Looks like through arrows were added overnight.
  13. R

    North Station Gateway | 251 Causeway St | Bulfinch Triangle

    this would be way more accurate if the tower portion was rotated so that the thin side faced north. as seen in the elevations:
  14. R

    10 World Trade | BGI Office Tower (Massport Parcel A2) | Seaport

    my guess is this: https://urbanglass.org/glass/detail/dramatically-curved-glass-building-generates-hazardous-light-reflection-pro
  15. R

    Bulfinch Crossing | Congress Street Garage | West End

    Read the discuss up thread. Nothing is be replicated.
  16. R

    Bulfinch Crossing | Congress Street Garage | West End

    Hatching on right (of this pic) because it will be behind construction fencing so median can be removed. Hatching on left because trucks (going to tunnels) can't make right turn without slip lane. Can't remove the slip lane and make a wider radius for trucks because the pedestrian crossing is...
  17. R

    Bulfinch Crossing | Congress Street Garage | West End

    what is being constructed now is an interim condition that keeps the median, but it and the SB lanes will be behind construction fencing. This work will open NB vehicles and sidewalks on both sides. final condition hasnt been exactly determined, but it removes the median and isnt expected to...
  18. R

    North Washington St. Bridge Lights

    such a random thing to harp on about. the structure isnt even complete, but the lights arent on?? btw, can we get this thread merged already
  19. R

    State Street HQ | One Congress | Bulfinch Crossing | West End

    when I went by this AM work was being done on the curbs.

Back
Top