    Bulfinch Crossing | Congress Street Garage | West End

    They are required to get the bus stop reopened within a certain time frame so that is why east parcel is being done next. it's also why it went from 3 buildings (with 2 over the orange/green lines) to 1 that is not over T infrastructure.
  2. R

    Bunker Hill Housing Redevelopment | Charlestown

    The 93 pre pandemic ran way more often than every 15 minutes and the T7 will as well (including 1 seat rides to downtown and seaport). All of this 'CTown isn't connected via bike' is more than a bit hyperbolic. No need to get to community college or whole foods. This route is 90% off street...
  3. R

    Franklin Park - White Stadium Renovation

    lets keep this in perspective that its a 10K seat stadium, not Foxborough, or even Fenway. The Orange line is a half mile away. I wouldnt call that no rapid transit.
  4. R

    Bulfinch Crossing | Congress Street Garage | West End

    the dark painted section will only be exposed until the other resi building is constructed.
  5. R

    Assembly Sq <-> Casino Footbridge

    There's an extra track on the southern end of the station.
  6. R

    Assembly Sq <-> Casino Footbridge

    the span would be longer there: https://www.google.com/maps/@42.3909782,-71.0769275,118a,35y,358.23h,51.91t/data=!3m1!1e3?entry=ttu
  7. R

    Bill Russell Bridge | North Washington St.

    the new bridge will have 5 travel lanes (2 outbound, 2 inbound, plus inbound bus lane) when finished.
  8. R

    The New Retail Thread

    also, not to defend Flynn or his position, but the OP is attributing text from an article as an actual quote from Flynn. there arent quotations in the UHub article.
  9. R

    Bill Russell Bridge | North Washington St.

    as of Oct 2022 update: 3 lanes of traffic will switch to the new bridge in Winter 2023 The bridge will be fully open to all users in Winter 2024 The contract will be completed in Spring 2025 after the temporary bridge is demolished From what I remember, the east sidewalk will open when the 3...
  10. R

    Wentworth Mixed-Use Life Sciences Complex | 500 Huntington Ave | Fenway

    Sweeney Field is going on the roof of the parking on parker St (converting lot to garage).
  11. R

    Gillette HQ and Technical Innovation Center | 232 A Street | Fort Point

    arent those just the zoning heights/density as set in the 100 Acres Master Plan?
  12. R

    MBTA Buses & Infrastructure

    From Seaport Square permitting docs: the 2000 South Boston Transportation Study which outlined a full build Silver Line condition of 89 vehicles per hour during the peak hours via the use of three bus sets operating in tandem. This would result in the Silver Line accommodating 195 passengers...
  13. R

    Bill Russell Bridge | North Washington St.

    As for the cones, I take the locks most days, so don't know how frequent it's been. But the 2 times I've seen it in use, left lane isn't used much and the opposite traffic (SB Rutherford and Chelsea st) is an absolute mess, including right now.
  14. R

    Hood Business Park | 480-570 Rutherford Avenue | Charlestown

    one of the great aspects is the open space going up onto the roof of the building. this was all open space and the City wanted to have a street wall on Rutherford. this solution solves for having the biggest open space and a street wall. BTD and MassDOT have long been undergoing a redesign of...
  15. R

    Bill Russell Bridge | North Washington St.

    yes and no on this. part of the reason the queue is on the bridge is because there is only the 1 lane feeding 4 at the actual signal. making this 2 lanes a longer distance will actually allow for more efficiency at the signal (but agreed, it wont help the queues coming up N Washington and...
  16. R

    Block G | 120 Seaport blvd | Seaport sq

    Seaport square master plan works like this, master plan approves uses/SF/envelopes of buildings (that's what the recent NPC was) and then each individual block goes through BCDC. It's always been this way (eg, 88 Seaport already through BCDC a couple years back, but not built). Block G has not...
  17. R

    The St Regis Residences (former Whiskey Priest site) | 150 Seaport Blvd | Seaport

    Cars can be moved. The other option would be ground level or 2nd level parking. No thanks. Not to mention 5' does protect below grade if there isn't a way for water to get into the building.
  18. R

    I-90 Interchange Improvement Project & West Station | Allston

    BU would not allow Babcock to be connected. just getting Malvern to connect (for buses only) was a fight. the intent would not be to only have those 2 bus lines connecting to the station. the busway and the connectivity it brings is big reason why west station is still part of all of this.
  19. R

    Widett Circle Development, so it begins.

    thats not accurate. even the first post of this thread does not go back far enough to include the entire process of whats been attempted.
  20. R

    MBTA Buses & Infrastructure

    https://www.mbta.com/events/2022-12-12/public-meeting-tremontcolumbus-avenue-bus-lanes-phase-2