Search results

  1. Koopzilla24

    MBTA Buses & Infrastructure

    Genuinely what? If this person gets off the 65 there for work its ~600' from the Longwood galleria stop. If this meeting or recently leading up to it was their first time seeing the routing it should be a red flag for someone who's supposedly chair of a Mobility Advisory Committee. This...
  2. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Tons of ties were unloaded at Norwood Central this morning. Not sure if this is for regular track and tie replacement or finally some more progress on double tracking.
  3. Koopzilla24

    Brookline Infill and Small Developments

    That Stop n Shop is a 10min walk at best from Lee's and all a gradual uphill coming back (I'll give you that its two stops on the 66). But that's a whole other can a worms because it's the main grocery option for the ~13k residents that live on the Southside down to Brookline. And then the ~3500...
  4. Koopzilla24

    Brookline Infill and Small Developments

    Oh no, we've created this wonderful mixed-use town center constantly full of life, and driving our town's economy with so much demand! Coolidge Corner sure is chaotic in the best way. One that demonstrates how great it is with it always being busy and flush with people. The actual density of...
  5. Koopzilla24

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    Idk to what extent the TSP activates along Beacon St but I've seen it in action. I was waiting to cross the tracks at the Star Market u-turn and the light turned green, only to immediately go back yellow to red because there was a train approaching heading Eastbound. I've been on the C when...
  6. Koopzilla24

    Fall River/New Bedford Commuter Rail (South Coast Rail)

    Unfortunately the New Bedford City Council and the residents believe the solution in the housing crisis is to only build a very specific few homes in places that they will never see them, or to magically make new homes appear that are only for the existing residents to instatntly afford and move...
  7. Koopzilla24

    Fall River/New Bedford Commuter Rail (South Coast Rail)

    A good part of those operational delays and unreliability has come from the unfinished SR-24 road works keeping the underpass as single track right next to the high traffic East Taunton Station and a long single-tracked section south of Brockton. Once that overpass is finished and the second...
  8. Koopzilla24

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    Additionally, from 4 days ago: The MBTA says it’s still ‘testing’ South Station fare gates.
  9. Koopzilla24

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    The Reddit thread itself was closed to comments by Mods because the whole thread is just speculating that they would somehow forget to design for cold. According to that same MOD fact check note, the gates are rated for -22F and the same technology is used in Ottawa. My guess is that they didn't...
  10. Koopzilla24

    New Red and Orange Line Cars

    The experience riding the CRRC trains feels like a lot of slipping on acceleration resulting in it being very jolty rather than smooth. It feels like regular losses in power from a loss in traction so I'd guess that can be fixed with software? Though i figure if that was it they wouldve found a...
  11. Koopzilla24

    New Red and Orange Line Cars

    Speaking of, I've been seeing ~8-10 of the new cars in the maintenance area of Cabot every day for a bit now (from Fairmount line commute window. It's hard to tell but it looked like a 4 car train half inside a maintenance bay, another 4 car train sat at that boarding platform outside, and a...
  12. Koopzilla24

    MBTA Construction Projects

    I think the only place they can put it is just north of the maintenance vehicle crossing and signal at the switch behind Encore. The grade really starts to steepen right around there but there's ~1200' to work with before the curve under Sweetser, which has quite the superelevation to it, making...
  13. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    A lot of very interesting information from this. Two-thirds of riders now reach Commuter Rail stations by bike or on foot should hopefully lead to some municipalities and the T reevaluating some of their Big Dig mitigation parking lots. In relation to the 71% Franklin Line modeshare, the...
  14. Koopzilla24

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    That was an initial plan for the system with renderings the MBTA "cautioned that the design could change down the road." The proposed new fare gates are meant to be wider and have tap in and out capabilities, which I dont like, but back in 2018 they stated "During the transition between new and...
  15. Koopzilla24

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    As of my commute yesterday 1/2/2026 the fare gates from platforms 8-13 were still covered and inactive.
  16. Koopzilla24

    MBTA Buses & Infrastructure

    It's the person who drives from Dorchester to Roxbury and is complaining about traffic that will never be convinced of anything. Most of the bus routes that travel through Dorchester go to Roxbury. They say they're now late to school dropoff (idk how not a minute of delay would cause that) but...
  17. Koopzilla24

    MBTA Fare System (Charlie, AFC 2.0, Zone, Discounts)

    The Fairmount Line has been operating this way since 2024. It's so that riders could use Charlie Cards to ride all the Zone 1A stops in a similar way to riding the subway lines. Platforms have fare readers so that you can tap your Charlie Card and it dispenses a single ride Zone 1A receipt. This...
  18. Koopzilla24

    Fall River/New Bedford Commuter Rail (South Coast Rail)

    I wanna know what brainiac in 1990 (when Debra Dr was constructed) decided a brilliant idea was to build a cul-de-sac right up to one of the few remaining quite active freight railroad ROWs in the state at the time to get 6 homes. Right around the corner from an intermodal at a junction, too...
  19. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    While I like the idea, it could bring weekend service to Stoughton, the problem is it'd eliminate the Stoughton Branch's pretty unbeatable time to South Station. It's only 40min to South Station and 30 to Ruggles. The only way driving is matching that is in the dead of night. Tacking on the...
  20. Koopzilla24

    Orange Line Extension to Roslindale/West Roxbury

    I don't think the yard space is much of an issue since there's ample space at the current Forest Hills yard area if it takes over the truck pad. Potentially double the current storage capacity there. If a new yard were indeed needed, I'd say you could put it down the former Woonsocket Branch at...

Back
Top