Search results

  1. ceo

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    I'd think it should be fairly easy to build an EMU with a (relatively) small battery in it to bridge electrification gaps at too-low bridges. Probably need some automatic mechanism to drop the pans at the right time.
  2. ceo

    The Official MBTA System Map

    My older kid did one of these spontaneously when they were 7 or so, it included all the subway and bus routes we typically use, the Museum of Science, Children's Museum, Aquarium etc. It was nearly 100% topologically accurate.
  3. ceo

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Wow, those really are recycled chunks of overpass deck. That's hilarious.
  4. ceo

    Transit via the Grand Junction Corridor | Cambridge and Boston

    Oh, this reminds me, F-Line, you need to update your username. :)
  5. ceo

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    And the NSRL is already future-proofed to some extent; not obstructing the hoped-for northern portals of the tunnel was one of the criteria for locating the GLX maintenance facility.
  6. ceo

    Biking in Boston

    Interesting concept, but none of them are reasonable walking distance while carrying a guitar from me. And the nearest Red Line station is a 15-minute walk from both my teacher and I, which would make it at least a 45-minute commute in each direction. It is a 15-minute bike ride, however (and...
  7. ceo

    Biking in Boston

    Welp, that's going to suck for me. My guitar teacher is on Broadway, and while I usually don't have a problem finding a parking place (I use his guest permit), there's not a whole lot of margin. And riding a bike carrying an acoustic guitar is kind of difficult.
  8. ceo

    Green Line Type 10 Procurement

    I noticed that too. It's one of the sections with wheels, so the seats are pushed to the inside in order to make room for them. Someone who apparently works in disability access was complaining that those sections were too narrow for a wheelchair or even a stroller, and that disability access...
  9. ceo

    Proposed watertown ferry

    The reason the Encore ferries are so small is they have to fit under the Alford St bridge, so they don't have to raise it for every ferry run. A ferry to the stadium would presumably dock on the east side of the bridge and could be a lot larger. (Not taking a position here on how useful such a...
  10. ceo

    Cape Cod Rail, Bridges and Highways

    MV is eminently bikeable; I've gone there with just bikes a few times (though it's been a few decades). It's hillier than Nantucket, but many of the roads have separate bike paths next to them. Oak Bluffs to Edgartown is a very pretty ride.
  11. ceo

    I-90 Interchange Improvement Project & West Station | Allston

    The FRA would have some things to say about it too. For example, "what the shrieking bloody f*ck are you people thinking?!"
  12. ceo

    North Station, Charles River Draw, & Tower A

    This is part of why the GLX maintenance facility and yard are located where they are; several of the other options were rejected specifically because they conflicted with the NSRL portal locations. So it's definitely a thing that is being actively planned around.
  13. ceo

    North Station, Charles River Draw, & Tower A

    Huh? This drawbridge doesn't interfere with NSRL in the slightest; the portals are going to be way back near the maintenance facility. Keeping the surface North Station is a necessary part of NSRL, because not all northside trains are going to run through.
  14. ceo

    Red Line Extension to Arlington Heights

    That's a really interesting idea, though it has the problem of any extension through Porter Square of having to squeeze a GL station under the CR station. It looks from an examination of the GLX route that you can get away with 20' for the ROW, and most of the corridor is 40' wide or wider. But...
  15. ceo

    Red Line Extension to Arlington Heights

    Yeah, the bit about the state law prohibiting a T station near Arlington Catholic is about the most 1970s Arlington thing I've ever heard. (I grew up in Lexington, so my anti-Arlington snobbery is well-rooted.)
  16. ceo

    Green Line Extension to Medford & Union Sq

    Both tunnels run under the North Station platform tracks, well away from the TD Garden and the Green Line ROW. https://maps.app.goo.gl/94cNVUxt2Sst9EeY9
  17. ceo

    Green Line Extension to Medford & Union Sq

    The tunnel where the yard is was built as part of the TD Garden construction all the way back in 1995. So planning for it took place well before even the original 1994 study of the GLX, and early in the Big Dig planning process. So I'm not sure what the space constraints would have been, other...
  18. ceo

    The Official MBTA System Map

    While you're revising, can the number be larger? It's nearly illegible at screen resolution.
  19. ceo

    Green Line Extension to Medford & Union Sq

    Someone please explain to me how it could be even remotely that expensive. At nearly all of the stations, the "vestibule" at the top of the stairs is plenty wide enough for a row of gates. East Somerville might be tricky, but the entrance is at ground level so it's easy to fix. Might have to...

Back
Top