Search results

  1. ceo

    Green Line Reconfiguration

    Yes, and I can't see a way to do that without building a honking big flyover of the entire Brickbottom Junction complex, and the bike path overpass might be in the way. If nothing else, people coming in from Everett and Chelsea can transfer to the Orange Line at Sullivan. In an ideal universe...
  2. ceo

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Since this came up again, and Google Maps has some nice up-to-date imagery of the route, I looked at the Urban Ring route through Brickbottom and Sullivan. It's over here in the Green Line Reconfiguration thread where it belongs.
  3. ceo

    Green Line Reconfiguration

    Google Maps now has up-to-date imagery of Brickbottom Junction, so I took a stab at figuring out how the Urban Ring could be built through there, and out to the Mystic River. Here's the result, zoom in to see the details. Some notes: We can't route the Urban Ring northbound up the Union Square...
  4. ceo

    Green Line Extension to Medford & Union Sq

    Yup. It's the standard problem with siting the terminus of a transit line, everyone's afraid people are going to drive in from the suburbs and park all over their neighborhood. With the College Ave location, that's Tufts's problem for the most part. Same reason they hated the West Medford terminus.
  5. ceo

    MBTA Buses & Infrastructure

    Yeah, a lot of people in Somerville are up in arms about these changes. The 80 duplicates the GLX route, of course, but cutting out the entire Broadway corridor between Teele Square and Winter Hill? That's one of the three major east-west routes through Somerville and a lot of people live there.
  6. ceo

    Green Line Extension to Medford & Union Sq

    That's part of the Somerville High School project. Was supposed to be a parking deck with a turf playing field on top, but I think the garage got VE'ed out. It also got significantly delayed due to asbestos contamination.
  7. ceo

    Green Line Extension to Medford & Union Sq

    I've been seeing the signals lit up north of Ball Square as well.
  8. ceo

    Biking in Boston

    Yeah, Friends of the Community Path, STEP and the other advocacy groups put a ton of pressure on the state to make the path wider, but they were all "we'd have to completely redesign it, it would cost a lot of money, tough noogies". That inbound downgrade is going to be fun and excitement on...
  9. ceo

    Fairmount Line Upgrade

    Hmm, or maybe you could convert it to light rail and connect it to the Transitway out to the Seaport. (Can't go to Chelsea that way though unless you build a new tunnel.) The connection would have to be 100% grade-separated through the Amtrak and MBTA maintenance yards and tunnel under the South...
  10. ceo

    Transit history/trivia quiz

    One could maybe argue that South Station isn't a "non-transportation building", but of course it also has office space in it (and is about to get a lot more). But you can also access South Station from the Federal Reserve building if you work there. Kendall outbound used to be accessible from...
  11. ceo

    Green Line Extension to Medford & Union Sq

    Last I looked, the power distribution cables were pulled to where they connect to the OCS, but hadn't been actually connected to it, in the Gilman Sq to Ball Sq stretch.
  12. ceo

    MBTA stations that are aging well

    Why is it signed "Airport Station"? So nobody gets confused and thinks it's the actual airport?
  13. ceo

    Biking the Boston 'Burbs (Trails, MDC, & Towns beyond Hubway area)

    The missing link I've been wondering about is the middle section of the Assabet River Rail Trail. Unfortunately, most of it is owned by Honey Pot Hill Orchards, which uses it as a service road and has said they don't want a bike path going through their orchard because people will steal their...
  14. ceo

    Biking the Boston 'Burbs (Trails, MDC, & Towns beyond Hubway area)

    Just to clarify, the MCRT alongside the Fitchburg Line in Belmont is in active development. They submitted the 25% design for the section from Blanchard Rd to Belmont Center in January.
  15. ceo

    North Station, Charles River Draw, & Tower A

    It's either that or the bridge has to be significantly elevated. Take your pick.
  16. ceo

    Other People's Rail: Amtrak, commuter rail, rapid transit news & views outside New England

    From the above link, wtf? In what universe does this ridiculous kludge even make sense, when the Empire Connection is already equipped with third rail? If anything they should extend the third rail to the junction with the Hudson Line, so they only have to run diesel north of Croton-Harmon.
  17. ceo

    Water Transportation in and around Boston

    I've brought my bike on the North Station-Seaport ferry a few times. You just hook the handlebars over the rail (or otherwise secure it) near the bow.
  18. ceo

    MBTA Buses & Infrastructure

    Right now, the 71/73 buses go in the south portal from Mount Auburn St to the upper busway, discharge passengers, go out the north portal, loop around the Common, come back in the north portal to the lower busway, pick up passengers (this is where the wrong-side door issue arises) and head out...
  19. ceo

    MBTA Buses & Infrastructure

    If you reverse the upper busway, you'll have the wrong-side door problem on both levels. Or do you mean reverse the lower one?

Back
Top