    I-90 Interchange Improvement Project & West Station | Allston

    Living in Allston-Brighton, it is really difficult to be upset about adding a yard here. As Stlin mentioned, the loss of developable land can be almost completely mitigated by building footings up front, and Harvard can basically be forced into funding them (it's not like a few hundred million...
  2. B

    Allston-Brighton Infill and Small Developments

    1954 Commonwealth Avenue "[The Proponent] proposes to develop a 26-unit multi-family residential development by relocating closer to Commonwealth Avenue and preserving the Site’s existing historic residence [...] and constructing behind the house a new 6-story building with connected central...
  3. B

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    I would hope this is just a placeholder name for planning documents and if the town of Brookline asked for a different name, they would get it. Frankly, I wouldn't be surprised if it just becomes "Brandon Hall" after all the paperwork is filed, but the planners are concerned about residents...
  4. B

    Great Scott Redevelopment | 1 Harvard Ave | Allston

    An LOI for building a Great Scott successor has been filed. We'll have to wait for the PNF, but some key points below: BPD Project: https://www.bostonplans.org/projects/development-projects/1-harvard-avenue For more context...
  5. B

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    I could be wrong, but this seems to only imply that 30 minute headways and 4-car diesel sets will (optimistically) happen by 2026. BEMUs are almost certainly not going to be used for any Commuter Rail service before the Fairmount Line pilot in 2028.
  6. B

    I-90 Interchange Improvement Project & West Station | Allston

    I believe the federal funds referenced in the Streetsblog article are from the "Reconnecting Communities" grant program. Spending them on the throat would probably be in violation of grant requirements, even if did include an Agganis Way ped/bike bridge. The work proposed seems to be almost...
  7. B

    Allston-Brighton Infill and Small Developments

    I couldn't agree more. In urban areas, it is almost uniformly cheaper to bury utilities. However, I will note that it is typically most cost-effective to do this work when the entire street is being repaved, instead of block-by-block. While the developer is throwing in some sidewalk...
  8. B

    Biking in Boston

    For the Route 57 Transit Priority Corridor, BTD is looking to fully repaint parts of Washington Street and Cambridge Street in Brighton. The project documents have not been updated, but they have stated that Washington Street is in too poor of condition to paint and will be fully repaved. New...
  9. B

    Allston-Brighton Infill and Small Developments

    For anyone interested, the Allston-Brighton Community Plan (ABCP) Open House is tonight from 6-8 at the Brighton Elks Lodge. This plan should inform future zoning (and likely the upcoming S+S initiatives in AB). More information about the Open House and ABCP is linked.
  10. B

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    Thank you for pulling that information from the slides. It definitely helps inform this conversation. I think there is a reasonable chance to see Butler, Milton, and Central Ave consolidated into a single station. They are all within about 1600 feet of Milton, and the Neponset Trail provides a...
  11. B

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    In this case, the main benefit of station consolidation/removal is cost savings. The T does not view leaving any station as non-ADA compliant as an option. As I said in a previous post, the expected cost of replacing the Valley Road station is almost $21 million, but was only serving 10 daily...
  12. B

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    After reaching out to the MBTA, I have some vague but mildly encouraging information on the Mattapan Line Transformation. Full quotes are below, with emphasis mine: On the Transformation project in general: "We are currently in the process of redefining aspects of the project scope with our...
  13. B

    Transit via the Grand Junction Corridor | Cambridge and Boston

    But a nice commuter shuttle solves basically all of these problems. It can be a timed transfer, similar quality to the Logan Express (which has no problem attracting suburbanites), and West Station is being designed to make bus/shuttle transfers as seamless as possible. As mentioned in a...
  14. B

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    I certainly agree. However, we should be clear that the choice of BEMUs for the Fairmount Line has nothing to do with what is best for the Fairmount Line and everything to do with testing BEMUs before committing to them system-wide. While I certainly don't like it, this doesn't seem like a case...
  15. B

    Biking in Boston

    I can't speak to Western Ave & N Harvard, but I know Cambridge St isn't getting touched as part of these improvements, although some minor changes should be made as part of the Route 57 Transit Priority Corridor project. One of the larger intersections that is getting treatment is North Beacon &...
  16. B

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Part of the T's logic for BEMUs is the assumption that costs will go down and performance will increase as battery technology improves. They didn't state this in the podcast but it shows up in other Rail Vision-related materials they've produced. This seems to be a reasonable assumption, but it...
  17. B

    I-90 Interchange Improvement Project & West Station | Allston

    Realistically, Grand Junction will need to be down for some amount of time, and building a temporary replacement connection will almost certainly cost more than it's worth, in both time and money. The emphasis should be placed on turning the amount of time GJ is down from years (which would...
  18. B

    I-90 Interchange Improvement Project & West Station | Allston

    I do think a major reason why we're hearing less about NSRL is that electrification is being viewed more and more as a prerequisite for it. And given the lack of clear electrification plans, it makes more sense to push those first. Both of these projects should be embraced, but it definitely...
  19. B

    35 Electric Avenue | Brighton

    The initial IAG and public presentations occurred earlier this week. Fire safety concerns were echoed by about a dozen people, mostly abutters. Basically everyone else was highly supportive of the project and all the improvements that could come on the site. City Council is planning a hearing...
  20. B

    MBTA Buses & Infrastructure

    I'm not sure anyone is claiming a 12% service reduction is acceptable. We just don't agree that all service needs to be restored before BNRD starts. Phase 1 of BNRD seems like a very cost-effective way to provide frequent service and likely result in very positive ridership impacts. It would not...