  1. BosMaineiac

    Green Line Reconfiguration

    They would have to look at using a large enough diameter to fit the stations within the bore. That should mitigate the concerns over the adjacent foundations and leave a larger margin for error. Of course, the head houses will need to be excavated but I think there’s room for that at Washington...
  2. BosMaineiac

    Green Line Reconfiguration

    Do you know/did it state in the report if the existing buildings are bearing on spread footings or if there are timber piles underneath the footings that are not shown? It also appears in this section that the station construction was to use slurry walls, similar to big dig technique. Was that...
  3. BosMaineiac

    Green Line Reconfiguration

    Doesn’t the Park St loop have too tight a radius for Type 10 vehicles? If trains use a loop there to turn back I think it has to be a reactivated outer loop, which will interfere with GC/north bound trains and thus reduce capacity overall.
  4. BosMaineiac

    Green Line Reconfiguration

    I'm glad we're revisiting the Essex St subway route, IMO the superior routing for a Seaport light rail connection, albeit with clear engineering challenges. Here's how I think we can achieve a crossover point at Boylston, with inspiration from Riverside's post and SLPhase3 plans on the last...
  5. BosMaineiac

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    My gut tells me they’re downplaying full electrification until they come up with a concrete plan of how to phase it into existence. Even if they’re overestimating the total cost of stringing up wires, it’s still a monumental task to do so systemwide. BEMU’s will have to be rolled out as an...
  6. BosMaineiac

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    The other way would be to tunnel a single track of commuter rail underneath the existing footprint. Not easy and I agree the options that you’ve outlined are highly unlikely, but I think it’s worth exploring when put up against a new flying junction to merge the red line tracks
  7. BosMaineiac

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    There’s enough room to add an island platform and double track at JFK/UMass without taking any red line tracks, so long as there’s some road dieting of Old Colony Ave and a reduced footprint of the busway at the station. I think it would be shortsighted to take away any red line tracks, as...
  8. BosMaineiac

    Everett Transportation (SL3 extension, potential OLX/GLX, Sweetser Circle infill station)

    Say in a Phase 1 urban ring world where the tracks are cut short at East Chelsea like depicted above, would it be beneficial to maintain a shared LRT/BRT ROW to Chelsea? I would think you want to maintain the SL3 right up until a TWT rail connection is built to connect to the transitway.
  9. BosMaineiac

    The Official MBTA System Map

    I believe @F-Line to Dudley mentioned that on this board at one point
  10. BosMaineiac

    Logan Airport Capital Projects

    Despite the high cost, the garage will pay for itself rather quickly. It will be a cash cow for Massport for a long time after it’s paid off. Note that, to offset the increased traffic, they are also expanding mass transit options in the form of increased Logan Express, silver line, and...
  11. BosMaineiac

    The Official MBTA System Map

    I like this. It also keeps with the spirit of the silver line phase 3 (albeit above grade). I would consider routing via High st though instead of Atlantic. I recall seeing a proposal to turn that into a bus only road to be shared with the T7, which I think would be pretty cool and useful.
  12. BosMaineiac

    General Infrastructure

    I’m not sure what you think would be a better solution. Wouldn’t it be better to have signaled crosswalks at all of the ramps? A SPUI or DDI will include this and the current layout doesn’t have any (at the ramps or roundabout). Either proposed option would be a major improvement over the...
  13. BosMaineiac

    General Infrastructure

    As of now, the circle gets completely backed up during rush hour from everyone trying to go around the circle from Morrissey to get on 93N. A more regimented left turn at a signalized intersection, plus the two lanes on Columbia dedicated to 93N (as shown in the documents) could solve this. I...
  14. BosMaineiac

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    As long as no one’s smoking on the trains I’m fine with this…
  15. BosMaineiac

    Crazy Transit Pitches

    It’s my understanding that Main, Broadway, and Binney streets will have to be at-grade regardless of mode. It looks like there’s enough room to bridge/pass under Mass Ave for either mode as well. I think the main argument is that light rail will be able to interface with traffic better than main...
  16. BosMaineiac

    Crazy Transit Pitches

    For the sake of humoring the T’s planning decisions, what if in order to speed up the circumferential service progress the “Gold Line” is in fact an FRA-spec BEMU/EMU between West Station and Chelsea? In a pros/cons argument, wouldn’t this be more enticing in the short term compared to a light...
  17. BosMaineiac

    I-90 Interchange Improvement Project & West Station | Allston

    She did, but Amtrak is now stepping in to say that they would like to use that space for layovers.
  18. BosMaineiac

    MBTA Construction Projects

    It looks to be an old bridge deck with a tactile pad slapped on it. The tops of wide flange steel beams are typically embedded in a cast-in concrete deck like that for a more robust connection. Plus it’s easier to install formwork that way.
  19. BosMaineiac

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    There really needs to be a new type of messaging (or new messenger) to get people excited for this type of project, and transit projects in general. Looking at the sentiment for the BHA bus lanes, for example, and you hear the same old tropes about traffic concerns and that adding travel lanes...
  20. BosMaineiac

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    It will happen. We'll see how successful the program is, but I guarantee we will see BEMU's rolling by 2028