Search results

  1. R

    Photo of the Day, Boston Style: Part XX (2026)

    I think the T has plans to replace the catenary with third rail. I think it historically it was catenary because the MTA was afraid of third rail icing near the ocean, and they didn’t want to invest in third rail heaters.
  2. R

    Weston infill and small developments

    They should just hang a “CEO co-working space for rent” sign on that building.
  3. R

    Commuter Rail to New Hampshire?

    At this point, they should just sock away the various study funding blocks for NH service in a high yield savings account. Wait a couple of years for a pliant administration up there and use the funds to build something. It would be more useful than yet another study that will say the same...
  4. R

    Somerville Infill and Small Developments

    Whenever I browse Zillow for amusement, I skip right over the desaturated flipper specials.
  5. R

    Porter Square Infill and Small Developments

    The patio is what bothers me the most. It’s a Pinterest look board slapped onto a space that fronts a traffic light and a rail corridor. The planters could provide screening from the sidewalk, but the owner just left them fallow. They didn’t even bother to clear the weeds along the sidewalk.
  6. R

    Porter Square Infill and Small Developments

    If you book, make sure to check that you have all your kidneys at checkout.
  7. R

    Porter Square Infill and Small Developments

    It’s an elaborate performance art piece, or a tax dodge. Look closely and all the TVs in the last photo are showing the same thing. The weed-filled planters on the patio are just the icing on the cake.
  8. R

    Acela & Amtrak NEC (HSR BOS-NYP-WAS and branches only)

    Out of curiosity, how much of the Passaic River was navigable above the Dock Bridge?
  9. R

    Portland International Jetport | PWM

    That feels out of date. JetBlue dropped the E190 last fall, and they prefer the CS300 now.
  10. R

    Somerville Infill and Small Developments

    Just what is available on the permit search, since it is a by right project.
  11. R

    Weston infill and small developments

    Maybe they can pick up Biogen’s former Weston HQ, which was closer to their then-CEO.
  12. R

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    This shutdown is a textbook example of why the Alewife truck pad is needed. If that pad was available, they would be able to keep the line open to Central or Harvard.
  13. R

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    I don’t think it can be replaced with normal ballasted track without substantially reworking the tunnels. The slabs need routine maintenance and eventual replacement. The T historically has been bad at routine maintenance. Replacement is not conducive to overnight work, due to the long cure...
  14. R

    585 Kendall | 585 Third Street | Kendall Square

    It’s better than the compressor station that was there two years ago
  15. R

    585 Kendall | 585 Third Street | Kendall Square

    Nice street wall developing along one side of Third St.
  16. R

    Somerville Infill and Small Developments

    It’s a new cottage ADU as part of 163 Morrison.
  17. R

    Kendall Common ( née Volpe Redevelopment) | Kendall Sq | Cambridge

    Temporary pavement to control the dust. I also wasn’t aware that the Biogen building was utilizing up/down construction.
  18. R

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    Anecdotally, most GL trains I have caught recently have had at least one car with the GLTPS upgrades.
  19. R

    If You Were God/Goddess | Transit & Infrastructure Sandbox

    I would expect that a new Boston airport would be located in the bay, east or northeast of Graves Light. Could it work with a Kansai-style parallel runway configuration, or are we stuck with a crosswind configuration?

Back
Top