Search results

  1. ceo

    General Infrastructure

    Oh, that's interesting, they're planning to replace the existing Appalachian Trail bridge over the Pike with a combined trail and wildlife crossing. That'll require some clever design. From the grant statement: I kind of doubt that they're going to design in separate trails for thru-hikers and...
  2. ceo

    General Infrastructure

    The existing rotary isn't under the highway, it's 100ish' to the east. I have to loop all the way around it regularly, coming back from Franklin Park Zoo, and being able to just turn left onto I-93 would be awesome.
  3. ceo

    General Infrastructure

    One of the options presented in the, er, presentation is a diverging diamond under I-93. I'm a bigger fan of SPUIs for no particular reason; one of the problems with them is that the large paved area can make snow removal problematic, but presumably that's less of an issue under an overpass.
  4. ceo

    Other People's Rail: Amtrak, commuter rail, rapid transit news & views outside New England

    I find it astonishing that quad gates aren't required on Class 6 track. It's easy to misjudge how much time one has to go around the gates (not that one should ever, ever do that), because looking up the tracks you really can't tell how fast the train is going.
  5. ceo

    Green Line Extension to Medford & Union Sq

    That makes sense. You want the crossing to be at the departure end of the platform, where the train is already stopped.
  6. ceo

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    Not if they have to stop there for some reason.
  7. ceo

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    I'd think it should be fairly easy to build an EMU with a (relatively) small battery in it to bridge electrification gaps at too-low bridges. Probably need some automatic mechanism to drop the pans at the right time.
  8. ceo

    The Official MBTA System Map

    My older kid did one of these spontaneously when they were 7 or so, it included all the subway and bus routes we typically use, the Museum of Science, Children's Museum, Aquarium etc. It was nearly 100% topologically accurate.
  9. ceo

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Wow, those really are recycled chunks of overpass deck. That's hilarious.
  10. ceo

    Transit via the Grand Junction Corridor | Cambridge and Boston

    Oh, this reminds me, F-Line, you need to update your username. :)
  11. ceo

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    And the NSRL is already future-proofed to some extent; not obstructing the hoped-for northern portals of the tunnel was one of the criteria for locating the GLX maintenance facility.
  12. ceo

    Biking in Boston

    Interesting concept, but none of them are reasonable walking distance while carrying a guitar from me. And the nearest Red Line station is a 15-minute walk from both my teacher and I, which would make it at least a 45-minute commute in each direction. It is a 15-minute bike ride, however (and...
  13. ceo

    Biking in Boston

    Welp, that's going to suck for me. My guitar teacher is on Broadway, and while I usually don't have a problem finding a parking place (I use his guest permit), there's not a whole lot of margin. And riding a bike carrying an acoustic guitar is kind of difficult.
  14. ceo

    Green Line Type 10 Procurement

    I noticed that too. It's one of the sections with wheels, so the seats are pushed to the inside in order to make room for them. Someone who apparently works in disability access was complaining that those sections were too narrow for a wheelchair or even a stroller, and that disability access...
  15. ceo

    Proposed watertown ferry

    The reason the Encore ferries are so small is they have to fit under the Alford St bridge, so they don't have to raise it for every ferry run. A ferry to the stadium would presumably dock on the east side of the bridge and could be a lot larger. (Not taking a position here on how useful such a...
  16. ceo

    Cape Cod Rail, Bridges and Highways

    MV is eminently bikeable; I've gone there with just bikes a few times (though it's been a few decades). It's hillier than Nantucket, but many of the roads have separate bike paths next to them. Oak Bluffs to Edgartown is a very pretty ride.
  17. ceo

    I-90 Interchange Improvement Project & West Station | Allston

    The FRA would have some things to say about it too. For example, "what the shrieking bloody f*ck are you people thinking?!"
  18. ceo

    North Station, Charles River Draw, & Tower A

    This is part of why the GLX maintenance facility and yard are located where they are; several of the other options were rejected specifically because they conflicted with the NSRL portal locations. So it's definitely a thing that is being actively planned around.
  19. ceo

    North Station, Charles River Draw, & Tower A

    Huh? This drawbridge doesn't interfere with NSRL in the slightest; the portals are going to be way back near the maintenance facility. Keeping the surface North Station is a necessary part of NSRL, because not all northside trains are going to run through.

Back
Top