Search results

  1. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    How does this section preclude a safety override switch for auto door systems?
  2. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    So, my $15 Walmart space heater has a kill switch that turns off if the switch is not depressed. Having a hard time understanding why the cars could not have a simular switch to keep a door closed if the platform is not adjacent to it
  3. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    So, I guess that, in 2024, the only choices we have are manually opening each door or opening all doors. On both sides, no doubt.
  4. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Actually, if done properly, a 6 car consist could do rear door first car, front door rear car.
  5. T

    New Red and Orange Line Cars

    Indulge me please
  6. T

    New Red and Orange Line Cars

    How many more trainsets are needed for 3 min frequency?
  7. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    I don't see a slope requirement
  8. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    I got that from someone at FRA
  9. T

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    A platform can have a 1% grade, so an 800ft platform can be 8ft lower on one end.
  10. T

    Cape Cod Rail, Bridges and Highways

    Where are you getting 6-9B per mile? Where are you getting these numbers from?
  11. T

    Cape Cod Rail, Bridges and Highways

    And lots of trains, and affordable housing (plenty of space at Otis) to reduce the traffic
  12. T

    Cape Cod Rail, Bridges and Highways

    They're talking 2-3B apiece, aren't they?
  13. T

    Cape Cod Rail, Bridges and Highways

    So, the present depth is 32ft. Let's assume future proofing to 50ft. Again, assume another 15 ft as a buffer. Add another 35ishft to reach the lower deck of a 55ish ft TBM shaft. About 2500ft of tunnel each side and then some trenches either side? The power ROW could be used to connect 495 to Rt...
  14. T

    Cape Cod Rail, Bridges and Highways

    Was tunneling explored as an option?
  15. T

    Seaport Transportation

    https://en.m.wikipedia.org/wiki/Guided_bus For very minimal cost, this would greatly increase speed/capacity, and would allow both BRT and LRT simultaneously
  16. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    So I guess all the new buildings being built in downtown Wormtown are all being built by delusional people. I'm going to guess that, baring data from you, the funders dumping a billion or more into Worcester may have data that refutes your feelings.
  17. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Worcester County grew by about 8 % between 2000 and 2020
  18. T

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Worcester Line improvements also facilitate "CompassRail" development. Worcester is the fastest growing city in the NE and better transit is needed to continue. The Worcester Line is the 2nd most used line
  19. T

    MBTA Construction Projects

    This is a tragedy
  20. T

    MassDOT Rail: Springfield Hub (East-West, NNERI, Berkshires, CT-Valley-VT-Quebec)

    And since the MBTA has nothing to do with it, it is not costing $40 million.

Back
Top