Search results

  1. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    N. Station - Oak Grove is being tentatively rescheduled to mid-fall, directly after a Back Bay - Forest Hills surge. I hope so. Looking at the latest internal schedule there is a Harvard-Park surge tentatively planned before Thanksgiving though...... Hopefully the August surge can speed things...
  2. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    My suspicion is the same re: the track access policy.
  3. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    No sooner do I reference the lack of transparency than I see an alert that Magoun Square is going to be bypassed tomorrow. The alert was barely posted over an hour ago (at the time of writing this message). There is also no reference to this in any of the T's press releases, only the prior...
  4. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Not sure why it's inbound only, but this is due to construction. Absolutely no inbound service for much of the day from N. Wilmington inward from May 20 all the way to October 4. I really don't like the lack of transparency with these construction schedules. I found out the October 4 date for...
  5. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Whether they'll actually use that 55+ mi/h spec or not is a whole different ballgame
  6. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Yeah, the 40 mi/h cap on Green being due to the 8's is well-documented. The other cases of moving the goalposts, both on the Green and on the heavy rail, are curious. Also this -- I get being nice and I try to be nice, but ultimately, if that light is green, I can't always wait, no matter how...
  7. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    We love the T moving the goalposts. A good amount of the Orange and Red Lines once ran at 55 mi/h (as per RFP docs from the fleet procurement that went to CRRC), and I'm told the Riverside line used to run at 50+ and GLX was designed for the same. As an operator, I'd love to do even 40 down the...
  8. nbcoram

    New Red and Orange Line Cars

    Definitely accurate that not all of this is within CRRC's control. However, I still think we are being too soft on them with regard to some of the other problems that have gone on specifically as it relates to the Springfield factory and delays that have happened over there. Just my opinion.
  9. nbcoram

    New Red and Orange Line Cars

    Jeff Gonneville just told the full board another OL pair will be delivered tonight, bringing it up to 114.
  10. nbcoram

    New Red and Orange Line Cars

    This info just came out of this morning's subcommittee and full board meetings. I understand why they are doing it, but relieving late penalties, rewarding them for meeting the updated schedule, etc. etc. and paying them up to $148 million MORE so that way the end of the contract is 13 years...
  11. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    All scheduled service will be 2-car trains. You may still see unscheduled 1-car trains at times for various reasons (mechanical issues, extra detail car, high number of call outs, etc.) Recently I drove a morning rush hour train on the B branch as a single, 19 minutes after the previous train...
  12. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Yep. Many people who like Mattapan also like it because it's relatively quiet, but at least anecdotally, less supervision is a big part of that. I obviously have not surveyed every single operator, as much as I might want to in order to get into the brains of some people.
  13. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I don't even think it's just a high-seniority thing. A lot of people even in my hire group, and other recent hire groups, hate the Type 9's (though the hatred is perhaps a bit less common among younger operators). Certainly though I think the 9 hate is borderline universal amongst older and more...
  14. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Time for Brookie to eat her words a bit. Taking a cursory look at pantograph, it looks like 20 of the Type 9's have been out at some point today and only one of them (3903) has not been out in the last four days (3903 being out since last June). So either the carhouse has improved with getting...
  15. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    The 9's are definitely a lot more popular among riders than ops employees. I like driving them, but the 9's force you to be more careful when driving. The legitimate gripes I can come up with for the 9's: -the mirror is slow to retract -at very slow speeds the non-emergency braking can be a...
  16. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    The Blandford siding is, to my knowledge, out of service (which is why the B diversions crossed back at Babcock). They did remove the trash bag thingy that was covering the "stop here to cross back" sign at Blandford, so maybe it will be back in-service soon. My question is why we didn't fix...
  17. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Crosstown service is a whole other can of worms. One day not that long ago I was a cover at Union Square and had an hour before my next trip and wanted Starbucks and went to the Kendall one since it was the first one that I thought of (Lechmere and Central's Starbucks locations are of a similar...
  18. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Part of the problem here is not what the Green Line does for its outer reaches, but rather what the Green Line does for downtown. It tries to fill the role of rapid transit in downtown and it doesn't do an especially good job of it. At the very least, Kenmore to North Station is the heart of the...
  19. nbcoram

    Site Issues

    I have the same question, as a trans person badly awaiting her username change, part of me is tempted to make a new account just so I don't have to look at a username that references (but thankfully in a stroke of luck does not directly use) my deadname. @vanshnookenraggen - any clue how to...
  20. nbcoram

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Did the town install some system to detect a train? Because the lights on the C are the least bad out of the three main surface branches. I thought Brookline had installed the lights to be TSP-ready if the T had ever gotten on board with it, but from what I had heard the T did not want to...

Back
Top