  1. Koopzilla24

    New Red and Orange Line Cars

    I'd say given that the MBTA, SEPTA, Brightline, Amtrak, St. Louis Metro, SFMTA, TriRail, WMATA, Cleveland RTA, BART, TriMet, Maryland MTA, LA Metro and others I'm probably forgetting are all having rail transit vehicles orders fulfilled or working on near future procurement without long standing...
  2. Koopzilla24

    New Red and Orange Line Cars

    The factory receives the railcar shells and performs finally assembly of them. This is standard practice for most rail rolling stock manufacturing facilities. The Alstom plant in Hornell, NY is under construction of their own shell manufacturing facility for $47mil so that they can do away with...
  3. Koopzilla24

    Roads and Highways General Development Thread

    I'm a bit confused as to how the project is under design through December while being very much under construction. The bridge decks over the swamps for the ramps are over halfway complete.
  4. Koopzilla24

    New Red and Orange Line Cars

    Incredibly long shot and an insane transit pitch but if CRRC packs up and heads out it'd be quite the opportunity to jump on creating a domestic rail rolling stock manufacturer using their facilities. We have the engineering and business talent and capacity in this state. A state owned or state...
  5. Koopzilla24

    New Red and Orange Line Cars

    What I gather from reports, meetings, and interviews over the past few years is that initially the federal government's political strife with the Chinese government resulted in large cost increases to ship parts here from China. This came 3 years after the factory was already being built. COVID...
  6. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    I just described how it's not "manually opening each door or opening all doors" I'm not following the issue here. The conductors can only open up to a combination of 3 doors from a single panel using 3 separate buttons which includes a door 85' away at the opposite end of the car the panel is...
  7. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    The way the automatic doors work is via a conductor pressing buttons for "this door, left, right." That's why the trains have 3 conductors during peak. They can open any combination of doors up to the full train except the locomotive adjacent one and the cab door which are both always kept...
  8. Koopzilla24

    I-90 Interchange Improvement Project & West Station | Allston

    The Commonwelath/Harvard/Brighton Ave densities go back to the street railway construction from 1898-1903 and are very long standing. Most of the brick and stone masoned buildings are at the newest from the 40s. Here's Packard's Corner in 1948 looking West down Brighton Ave It's all still here...
  9. Koopzilla24

    I-90 Interchange Improvement Project & West Station | Allston

    These are the populations and densities of the census tracts in and around the project area: From the 2010 population data so it's probably gone up a bit. The fact that the tract including all of the Allston-Cambridge exit, Beacon Park Yard, and yet unbuilt Harvard developments still has a...
  10. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    It appears copying my table for the zone changes actually moved around things to different cells and I didn't notice at first. I tried to ensure no zones were skipped. Also any station I did not list is because I wouldn't change its current zone. This is what it should be as screenshot from my...
  11. Koopzilla24

    Biking in Boston

    There seriously needs to be some sort of secure bike storage at Boston Landing ASAP. Bikes and parts are constantly stolen there (my whole bike was) and the bolts securing the racks to the ground have been removed for months. Thieves have been simply tipping over the rack and removing bikes...
  12. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    This is for the Regional Rail fare structuring discussion in the SCR thread but should probably go here: I did a bit of a draft Regional Rail fare restructuring a while back prompted by SCR and Fall River/New Bedford potential pricing and came up with this: One Way Monthly 1a 2.4 75 1...
  13. Koopzilla24

    New Red and Orange Line Cars

    Orange Line up to 15 trains running peak service
  14. Koopzilla24

    I-90 Interchange Improvement Project & West Station | Allston

    It'd be neat to see some Toronto area style residential high rise TOD around the West Station site. A new node of very high density could be well-supported by the existing amenities like restaurants, groceries, and entertainment, combined with the station. There's currently a 6 story...
  15. Koopzilla24

    I-90 Interchange Improvement Project & West Station | Allston

    Boston Landing's first steps away from an industrial area to a residential area were shaky with mostly limited commercial and office venues and a single large new residential build that's half parking garage, but going east down along the pike there's a bunch of residential apartment buildings...
  16. Koopzilla24

    MBTA Construction Projects

    Natick Center slowly coming together
  17. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Service is currently slow zone limited not staff limited hence frequency increases coming to everything but Orange (equipment shortage). Once the slow zone situation is sufficiently mitigated then Red Line equipment and motorpersons/overall dispatchers, which I think is mostly resolved, come...
  18. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    What I understand from the WGBH Big Dig podcast is that a MA state "authority" like the MBTA is in a position as a pseudo-private company whilst being state owned so that it can operate as a theoretically/potentially for-profit business (like the Port Authority) whilst still receiving continual...
  19. Koopzilla24

    Biking in Boston

    Yeah Beacon, Washington, and Harvard Ave all need protected or separated lanes as well. I need to go between Brighton at the outer end of Comm Ave and Ruggles everyday and Washington St to Huntington is so unpleasant and the drivers are ridiculous. I now take Comm Ave down to Essex and then back...
  20. Koopzilla24

    Biking in Boston

    Boston currently suffers from a serious shortcoming in that there is not a single protected bike route to go between the Charles Esplanades-Comm Ave-Emerald Necklace-SW Corridor Park. Mass Ave would mostly only require swapping some street parking and the bike lane to be protected along most of...