Search results

  1. Jahvon09

    There is a problem with posting.

    To the Moderators; Why is it as of late, that I've been getting this notice that says; "We've run into a problem." Then when I enter the post, it comes up TWICE! Is there a problem with the forum or something? :unsure:
  2. Jahvon09

    Sumner Tunnel to be Given Shortened Full Summer Closure for Repairs.

    The Summer will close this summer from July 5 through August 31 for much needed repair work. Almost like what the MBTA did for the Orange Line last summer. Work will start for the ceiling this weekend. East Boston residents are a little worried about the noise that it may cause. :)...
  3. Jahvon09

    Boom Breaks ground for $500M factory & looks to roll out first SST Jetliner in 2026.

    Boom has broken ground to build a factory to make the first SST jetliner (Overture) since the Concord! (link below). :) Boom breaks ground on $500M factory, looks to roll out first supersonic airliner in 2026 - Denver Business Journal (bizjournals.com)
  4. Jahvon09

    Rehabbed Old Trolley Back in Service on Mattapan Line.

    One of the old Trolleys on the Mattapan Line is back in service after months of repeated delays, while commuters were promised countless times that it would return to the line. :)...
  5. Jahvon09

    MBTA may go All-electric With Commuter Rail.

    The MBTA may go all- green with its transit system, including remaking the commuter rail with all-electric vehicles. :unsure: https://www.mbta.com/sustainability/greening-the-fleet-decarbonizing-the-mbta
  6. Jahvon09

    MBTA Electric Buses by 2030?

    The MBTA hopes to have an all-electric fleet of transit buses in place by about 2030 or so. :unsure: https://mass.streetsblog.org/2021/09/30/environmentalists-press-t-for-all-electric-bus-fleet-by-2030/
  7. Jahvon09

    Charlie Card Store to reopen on November 3rd.

    The MBTA Charlie Card Store will reopen on November the 3rd. It was closed for a while, I think because of covid-19. The store will be open with limited hours though. Check the scheduling on the T's website. Monday Closed No in-person transactions Tuesday, Thursday 8:30 AM – 1 PM Open to...
  8. Jahvon09

    The Brookliner | 5 Washington Street | Brighton

    The old gas station is being torn down as we speak.
  9. Jahvon09

    Newer Redesigned Longer Green Line Trollies!

    The MBTA is embarking on getting newer longer Green Line trollies, but at a bigger price tag. These will be about 124 feet long over the present 75-foot ones ones in use now. Some track work will be needed, to be able to accommodate them, such as fewer curves & other things. The planned target...
  10. Jahvon09

    Winter 2017 / 2018; MBTA.

    The MBTA Is again having trouble & delays. Winter has just started and there are problems already. This past week saw delays on a few lines, mainly the Red Line. The 2 recent snowstorms & bitter cold have caused commuters to stand on platforms in artic air, making things very difficult for...
  11. Jahvon09

    New ways That you'll be Paying to Ride the T.

    The MBTA is planning to replace the present ways that you pay to commute on the system. Click on the link below. :cool: http://www.masslive.com/news/index.ssf/2017/11/here_are_the_new_ways_youll_be.html
  12. Jahvon09

    Why can't we post Links to Videos?

    We used to be able to do this. Now all of a sudden it appears to have been stopped or has stopped on its own. Why is that?
  13. Jahvon09

    Comm Ave Bridge Replacement.

    The Comm. Ave. Bridge located over a portion of the Mass Pike is scheduled to be replaced. The project will take at least two summers to complete (Link below). It will be done in 2 segments. The first one will take place during this coming summer. The 2nd one will take place next summer. The...
  14. Jahvon09

    First of MBTA's 86 Refurbished Green Line Trolleys Return to Service.

    The first of 86 refurbished Green Line trolleys is returning to revenue service. The trolleys which were originally manufactured by Kinki in Osaka, Japan had gone on for about 2-1/2 decades without being rebuilt, have shown tremendous sign of were & tear, as well as roof corrosion, rusting and...
  15. Jahvon09

    Washington, DC; / New WMATA Railcars; / Service Entry; 04/14/15.

    Don't know where else to put this, but...., The first train set of 8 all-new rapid transit railcars for the WMATA will be put into revenue service beginning next month on April 14 (see link below)! The new cars will feature some of the very latest things in stae-of-the-art technoligy. The new...
  16. Jahvon09

    MBTA Winter 2015: Failure and Recovery

    Mayor Marty Walsh is saying that the impending snowstorm tomorrow might be a whopper of a storm, and that the MBTA could be affected by it. He may have all MBTA service suspended, possibly until Wednesday. Gov. Charlie Baker is contemplating banning regular vehicles from using the streets &...
  17. Jahvon09

    Revere Infill and Small Developments

    Can someone please tell me what is about to be put into the spot at the shopping center where the Stop & Shop supermarket used to be? Will it be another supermarket going in there? The place is just between the Wonderland & Revere Beach stops on the Blue Line. Driving up in there, I notice...
  18. Jahvon09

    This recent Snowstorm Not a Pleasurable One for the MBTA!!

    The MBTA has had multiple problems with their transportation equipment in the last few days. They are admittedly blaming the commuter problems on old equipment, noting that all of the rapid transit lines had suffer with problems except the Blue Line. The Blue Line has the most modern and...
  19. Jahvon09

    PHI, / Comcast I&T Center / 59 Flrs / 1,121 Ft. / Status; Appr'd/ Est. Compli; 2017

    PHI, / Comcast I&T Center / 59 Flrs / 1,121 Ft. / Status; Appr'd/ Est. Compli; 2017 Comcast to Expand Philadelphia Presence with Comcast Innovation and Technology Center Designed by Lord Norman Foster and developed by Liberty Property Trust to achieve LEED Platinum Certification, the 59-story...

Back
Top