Search results

  1. T

    Metropolitan Storage Warehouse Redevelopment/Renovation (MIT) | 134 Mass. Ave | Cambridge

    Scaffolding is down on the back end/loading dock area of the building, revealing the "slice" of windows and the interior skylights. Also, ongoing work to "core-out" round sections of bricks is visible. A render from DS+R shows what we can expect that to look like from the inside:

Back
Top