1558 Tremont street | Mission hill

stick n move

Superstar
Joined
Oct 14, 2009
Messages
11,278
Reaction score
15,650
This was approved so time for its own thread.


20e6bb55-616f-4d97-9321-bb3942027b36


“The Proponent is proposing the demolition of the existing three-story vacant building and constructing a six (6) story, mixed-use multi-family building with ninety-five (95) residential units, approximately 3,228 SF of first floor retail, and fifty-three (53) parking spaces (25% EV spaces, 75% EV ready) for the Boston’s Basilica Our Lady Of Perpetual Help Church and the building’s residents (the “Proposed Project”).

Collectively, the Proposed Project will contain approximately 74,596 SF of gross floor area. The new building will incorporate landscape and hardscape improvements, including an outside café area, and significant improvements to the public realm. The residential building will contain ninety-five (95) rental units, consisting of fifty-nine (59) studio units, twenty-two (22) one-bedroom units, and fourteen (14) two-bedroom units.”

https://www.bostonplans.org/projects/development-projects/1558-tremont-street















https://bpda.app.box.com/s/c175xekjnh8kxn1v3u70kb90aodxqlnc
 

Back
Top