Search results

  1. Koopzilla24

    Biking in Boston

    Yes I should have explicitly included enforcement in there, in my head it was part of that "infrastructure that prevents dangerous cycling." Though even with enforcement you can't have everything covered at every time. There will always be the rule-breakers, thats why there should be physical...
  2. Koopzilla24

    Biking in Boston

    With driving culture being so ingrained in Americans, most if which probably car commuted before bike commuting, that road behavior has carried on into their cycling. In particular the not being courteous around pedestrians or slower riders part. Ultimately humans will always have those that...
  3. Koopzilla24

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    The other day I saw a Type 9 on the B with a headsign reading "Express to Harvard Ave" which I have not seen displayed before. I don't know if I've conveniently never seen an express Type 9 from the outside and only been in them where the interior signs do display express
  4. Koopzilla24

    Biking in Boston

    The Carlton Bridge bike channels have still not been fixed
  5. Koopzilla24

    MBTA Buses & Infrastructure

    Just got a Better Bus Project update email and this paragraph was interesting. This would suggest they never had an inventory of physical bus stops and signs before, only the # and ID of the stop itself but nothing related to the physical infrastructure. Id imagine it was on a by sight or...
  6. Koopzilla24

    MBTA Buses & Infrastructure

    I took the 34E everyday up until last fall out to Norwood and back for work because I couldn't afford the commuter rail more than a few times a month. Most of the traffic out beyond Norwood is local Norwood-Walpole rather than all the way to Boston. There was typically up to 5 people that I'd...
  7. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    Aren't the complaints of idling noise and horn sounding primarily directed at the CSX yard? The MBTA yard is separated from the nearest home by 400' of other industrial buildings and trees, and those trains are typically hooked up to off-board power so that they don't idle unless they're...
  8. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    This us in the technical requirements for the Red #4 and Orange #14 rolling stock so with the new digital signaling the capability is there to make it safely happen when track work is done and fixed. Full depth track replacement of various parts of the rapid transit system is in the CIP so if...
  9. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    With 30min being the scheduled run time of the Fairmount under diesel power I'd assume they'd run 2 dedicated trainsets all day that only dwell at the ends long enough for boarding and alighting (and if they're ahead of schedule). Compared to currently where they sit at the ends for ~15min, this...
  10. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    This is exactly what more people need to understand. The Green Line is (for the most part) just a tram and incredibly subject to human variables in speed and schedule adherence. Entire long light cycles at major intersections can be missed when an operator decides to kindly reopen doors for...
  11. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    I didn't see it before but apparently the plan since 2021 has been to replace the 94 Type 5s 25 years into their life (seems short for the T) with 130 Type 6s
  12. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Transition to the what now?
  13. Koopzilla24

    I-90 Interchange Improvement Project & West Station | Allston

    The stretch from Union Sq to Harvard Ave really shouldnt have street parking with all the off street parking in the area as well as non-permit side streets. If anything, this stretch of Cambridge street should've done what Washington St in Roslindale does with peak bus lanes that have full time...
  14. Koopzilla24

    General MBTA Topics (Multi Modal, Budget, MassDOT)

    Could also be the flyover/under on approach to JFK. The split between the Ashmont and Braintree tracks happens just north of the southbound flyunder and when I last went down to Ashmont after the track work it was still a 10mph slow zone. The speed restrictions dashboard only start the Braintree...
  15. Koopzilla24

    Hyde Park Infill and Small Developments

    Every picture i take is too blurry because I'm on a moving Franklin Line train but all the foundational pours are complete and the first level of the central support/elevator shaft has been poured and set. They were working on prepping for the second shaft pour this morning whilst other crews...
  16. Koopzilla24

    MBTA Commuter Rail (Operations, Keolis, & Short Term)

    The has been a lot of Keolis activity going on at Norwood Central this past week. They've been stationing heavy equipment like a front loader and small truck crane there as well as having teams of hi-vis wearing personnel inspecting things and surveying. Potentially preliminary work towards...
  17. Koopzilla24

    New Red and Orange Line Cars

    I'd say given that the MBTA, SEPTA, Brightline, Amtrak, St. Louis Metro, SFMTA, TriRail, WMATA, Cleveland RTA, BART, TriMet, Maryland MTA, LA Metro and others I'm probably forgetting are all having rail transit vehicles orders fulfilled or working on near future procurement without long standing...
  18. Koopzilla24

    New Red and Orange Line Cars

    The factory receives the railcar shells and performs finally assembly of them. This is standard practice for most rail rolling stock manufacturing facilities. The Alstom plant in Hornell, NY is under construction of their own shell manufacturing facility for $47mil so that they can do away with...
  19. Koopzilla24

    Roads and Highways General Development Thread

    I'm a bit confused as to how the project is under design through December while being very much under construction. The bridge decks over the swamps for the ramps are over halfway complete.
  20. Koopzilla24

    New Red and Orange Line Cars

    Incredibly long shot and an insane transit pitch but if CRRC packs up and heads out it'd be quite the opportunity to jump on creating a domestic rail rolling stock manufacturer using their facilities. We have the engineering and business talent and capacity in this state. A state owned or state...

Back
Top