Search results

  1. fattony

    Crazy Transit Pitches

    Side topic: The words “immediate” and “RLT” don’t seem to belong in the same sentence. When do you realistically think we’ll see 3 minute headways on Red?
  2. fattony

    Electronic Tolls (& Avoidance)

    Every day I see 75% or more of riders board the GLX without validating at the fare machine. I'm one of the suckers who actually pays. If you don't enforce something at all, evasion becomes rampant and the losses become significant. You are right that toll evasion may not be significant enough...
  3. fattony

    Electronic Tolls (& Avoidance)

    I can imagine a system to catch people, though given this state’s appetite for traffic enforcement (absolutely none), it would never happen. Post a cruiser downstream from a camera. If an obstructed plate is detected, text a photo of the car to the cop to pull them over and ticket them. There...
  4. fattony

    ISQ3 | 22 Drydock Avenue | Seaport

    If that’s the way it is, then so be it. I guess I would have preferred they just maximize the footprint. I dislike these half-assed plazas. I think they are worse than no plaza at all. My company has our laboratory in IDB, so I travel through this intersection once in a while. A fair number of...
  5. fattony

    ISQ3 | 22 Drydock Avenue | Seaport

    With so little retail and the way it is oriented, these plazas are going to be empty or utilized exclusively by people working in the building. I hope there is some pushback to demand something better than “underutilized outdoor corporate lunchroom”. This is pretty disappointing.
  6. fattony

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    A partial build NSRL is called electrification and transformation from Commuter Rail to Regional Rail. The digging needs to happen all at once, but there is so so much work to do before digging.
  7. fattony

    The Official MBTA System Map

    Just as general observation, there is a ton of white space in Cambridge, the Charles, and Back Bay. Perhaps you can rethink the size and orientation of the legend and redistribute some of that white space. If it helps at all, GLX Medford branch can really be compressed - this makes it look like...
  8. fattony

    Idea for fixing the housing shortage

    I suspect though I could be mistaken, that in our painfully supply constrained market, multi family is always more profitable to build than single family. Three units of 1000 square feet each costs marginally more to build than one SFH of 3000 square feet, but sells for far more. I suspect you...
  9. fattony

    Golf Course Redevelopment

    100% Underutilized land area outside the urban center is not now and never has been a significant contributor to the housing crisis. This argument against golf courses just sets up a NIMBY strawman that the vicious developers are coming for every scrap of green space including Boston Common...
  10. fattony

    Pinnacle at Central Wharf (Harbor Garage) | 70 East India Row | Waterfront | Downtown

    Wow, good thing this thread got unlocked. Stimulating discussion… :rolleyes:
  11. fattony

    Green Line Extension to Medford & Union Sq

    On GLX presently. Train is running … fast. I clocked us at 40mph with a phone app. The GLX has never run this fast since opening. Something has changed.
  12. fattony

    Green Line Extension to Medford & Union Sq

    Somerville PD makes absolutely no attempt to pull over automobiles for running stop signs at full speed or driving >50mph in a school zone, but you guys are talking about radar for e-bikes on the community path? No traffic laws are enforced in Somerville and haven’t been in the 13 years that...
  13. fattony

    Housing (Supply Crisis & Public Policy)

    Have you ever considered that the alteration of the urban landscape would be... (now don't grip your pearls too tight!) ... for the better?
  14. fattony

    Regional Rail (RUR) & North-South Rail Link (NSRL)

    Would anyone care to comment on the implications of passing Question 1 on NSRL timeline? Like, what fraction of the $1.2-2 Billion per year might reasonably be directed to electrification and NSRL and what does that translate to in real world outcomes?
  15. fattony

    Green Line Extension to Medford & Union Sq

    Do you have a drawing or link to something that shows the final configuration of that intersection?
  16. fattony

    Green Line Extension to Medford & Union Sq

    Curb extension/bump-out being built opposite Ball Square Station. The intersection of Broadway and Boston Ave is being reworked for pedestrian comfort.
  17. fattony

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    How about not storing them there? If they are discarded rails, then discard them. The job isn’t done until it is done. When you are finished with dinner, you wash the pots and pans.
  18. fattony

    Davis Square Lab | 231-249 Elm Street and Grove Street | Somerville

    I think you are sort of splitting hairs with people per square foot. My office utilization is way down, with the majority of chairs empty the majority of days. I suspect that lab utilization is not. And going forward, I don’t see people tolerating jam-packed office layouts for much longer. If...
  19. fattony

    MBTA "Transformation" (Green Line, Red Line, & Orange Line Transformation Projects)

    I missed my Downeaster this afternoon because of the OL slow zones. I'm pissed. That is all.
  20. fattony

    Boston Harbor Flood Protection Projects

    Transportation corridor for who? Being a narrow causeway with water on either side, it has no catchment for public transportation. The only thing it could possibly be is a bypass highway around Boston. I suspect the economic cost/benefit is not going to come out favorably for that and the...

Back
Top