That's at least a 300 ton crane, if not 400 ton. I'd call that a real crane.
From the same logistics/schedule video that you referenced, it looks like the plan for the bus terminal is to have a second crawler crane set up on the east side of the tracks.
For the tower portion, I wouldn't be...